Influencing Factors and Control Measures for Post-Construction Settlement of High-Fill Red Clay Embankment

This study systematically investigates the post-construction settlement behavior of high-fill red clay embankments, focusing on the influences of three key factors (water content, degree of compaction, and lift thickness) and the effectiveness of geogrid-based reinforcement measures. A three-dimensional finite-element model based on the Mohr–Coulomb constitutive theory was established using MIDAS GTS NX 2022 R1 to simulate staged construction processes and long-term settlement under self-weight loading. The results indicate that settlement is predominantly concentrated in the upper fill zone adjacent to the slope surface, with displacement contours sagging inward toward the fill interior, while the underlying foundation undergoes negligible deformation. An elevated water content and reduced degree of compaction significantly enhance the compressibility of red clay, leading to increased settlement magnitudes and prolonged stabilization periods. Excessively thick lifts result in inadequate deep compaction, thereby inducing larger final settlements. Two reinforcement schemes (geogrid combined with anti-slide piles and geogrid combined with a gravity retaining wall) were verified to effectively mitigate post-construction settlement, with the former achieving a more pronounced improvement in the embankment stability coefficient. Based on the comprehensive analysis, optimal construction control parameters for high-fill red clay embankments are proposed: precise regulation of water content, maximization of compaction degree, and adoption of a lift thickness of approximately 30 cm. The findings of this study provide quantitative technical support and design references for the settlement control of similar high-fill red clay embankment projects in southern China’s mountainous and hilly regions.

Authors

Institutions

Publication Details

Journal
Eng—Advances in Engineering
Published
2025-12-12
DOI
https://doi.org/10.3390/eng6120363
Primary Topic
Geotechnical Engineering and Soil Stabilization
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Influencing Factors and Control Measures for Post-Construction Settlement of High-Fill Red Clay Embankment

K. L. Li, Xuemin Zhang, Runping Jia, Yuchen Yang et al.
Eng—Advances in Engineering
Geotechnical Engineering and Soil Stabilization
article

Influencing Factors and Control Measures for Post-Construction Settlement of High-Fill Red Clay Embankment

K. L. Li, Xuemin Zhang, Runping Jia, Yuchen Yang, Jianbin Xie, Bin Wu
article en

Abstract

This study systematically investigates the post-construction settlement behavior of high-fill red clay embankments, focusing on the influences of three key factors (water content, degree of compaction, and lift thickness) and the effectiveness of geogrid-based reinforcement measures. A three-dimensional finite-element model based on the Mohr–Coulomb constitutive theory was established using MIDAS GTS NX 2022 R1 to simulate staged construction processes and long-term settlement under self-weight loading. The results indicate that settlement is predominantly concentrated in the upper fill zone adjacent to the slope surface, with displacement contours sagging inward toward the fill interior, while the underlying foundation undergoes negligible deformation. An elevated water content and reduced degree of compaction significantly enhance the compressibility of red clay, leading to increased settlement magnitudes and prolonged stabilization periods. Excessively thick lifts result in inadequate deep compaction, thereby inducing larger final settlements. Two reinforcement schemes (geogrid combined with anti-slide piles and geogrid combined with a gravity retaining wall) were verified to effectively mitigate post-construction settlement, with the former achieving a more pronounced improvement in the embankment stability coefficient. Based on the comprehensive analysis, optimal construction control parameters for high-fill red clay embankments are proposed: precise regulation of water content, maximization of compaction degree, and adoption of a lift thickness of approximately 30 cm. The findings of this study provide quantitative technical support and design references for the settlement control of similar high-fill red clay embankment projects in southern China’s mountainous and hilly regions.

Eng—Advances in EngineeringVol. 6(12)
Central South University (CN), Yunnan University (CN), Yuntianhua Group (China) (CN), Yunnan Investment Group (China) (CN)
Openalex Percentile: Top 59%
Geotechnical Engineering and Soil Stabilization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.