Research on the construction and optimization model of robustness indicators of program schedules considering multi-stakeholder cascading effects

Purpose This study fully considers the cascading effects in the program, constructs a schedule robustness evaluation indicator under the cascading effects of program schedule and quality and proposes an optimization method for program schedule robustness. This study aims to improve the program schedule robustness, thereby enhancing its risk resistance capacity. Design/methodology/approach Through a dual-methodological approach: (1) Simulation techniques quantify CPs’ cascading effect coefficients, while (2) theoretical derivation calculates unstable penalty costs. The integrated optimization model is empirically validated using Program Z as a case study, combining robustness indicators that capture both fundamental temporal parameters (start/finish time and duration) and multi-stakeholder dynamics (schedule/quality cascading effects). Findings The proposed model demonstrates superior stability and effectiveness compared to existing methods. Case results confirm that the dual-factor robustness indicators (basic + cascading factors) provide scientifically valid measurements. The solution methodology successfully overcomes previous limitations in handling complex stakeholder interdependencies. Practical implications This study provides program managers with feasible solutions to optimize the schedule, aiming to enhance the risk resistance capacity of programs and reduce their losses caused by uncertainties. Originality/value This paper considers both quality and schedule simultaneously for the first time, constructs program robustness indicators that take cascading effects into account and establishes a program robustness optimization model based on the indicators. This paper provides new ideas and insights for improving the risk resistance capacity of programs. Theoretically, this study extends the complex systems theory and program management perspective by introducing a dual-dimension robustness framework that integrates quality- and schedule-driven cascading effects. It deepens the understanding of how multi-stakeholder interactions influence program robustness through systemic propagation mechanisms.

Authors

Institutions

Publication Details

Journal
Engineering Construction & Architectural Management
Published
2025-12-11
DOI
https://doi.org/10.1108/ecam-07-2025-1084
Primary Topic
Resource-Constrained Project Scheduling
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Research on the construction and optimization model of robustness indicators of program schedules considering multi-stakeholder cascading effects

Jingyan Chen, Juan Ding, Xu Chen, Hui Feng
Engineering Construction & Architectural Management
Resource-Constrained Project Scheduling
article

Research on the construction and optimization model of robustness indicators of program schedules considering multi-stakeholder cascading effects

Jingyan Chen, Juan Ding, Xu Chen, Hui Feng
article en

Abstract

Purpose This study fully considers the cascading effects in the program, constructs a schedule robustness evaluation indicator under the cascading effects of program schedule and quality and proposes an optimization method for program schedule robustness. This study aims to improve the program schedule robustness, thereby enhancing its risk resistance capacity. Design/methodology/approach Through a dual-methodological approach: (1) Simulation techniques quantify CPs’ cascading effect coefficients, while (2) theoretical derivation calculates unstable penalty costs. The integrated optimization model is empirically validated using Program Z as a case study, combining robustness indicators that capture both fundamental temporal parameters (start/finish time and duration) and multi-stakeholder dynamics (schedule/quality cascading effects). Findings The proposed model demonstrates superior stability and effectiveness compared to existing methods. Case results confirm that the dual-factor robustness indicators (basic + cascading factors) provide scientifically valid measurements. The solution methodology successfully overcomes previous limitations in handling complex stakeholder interdependencies. Practical implications This study provides program managers with feasible solutions to optimize the schedule, aiming to enhance the risk resistance capacity of programs and reduce their losses caused by uncertainties. Originality/value This paper considers both quality and schedule simultaneously for the first time, constructs program robustness indicators that take cascading effects into account and establishes a program robustness optimization model based on the indicators. This paper provides new ideas and insights for improving the risk resistance capacity of programs. Theoretically, this study extends the complex systems theory and program management perspective by introducing a dual-dimension robustness framework that integrates quality- and schedule-driven cascading effects. It deepens the understanding of how multi-stakeholder interactions influence program robustness through systemic propagation mechanisms.

Engineering Construction & Architectural Management
Hohai University (CN), Nanjing Institute of Technology (CN)
Openalex Percentile: Top 55%
Resource-Constrained Project Scheduling
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.