Weight and target value-based algorithm for predicting Overall Equipment Effectiveness

For industrial companies, accurate short and medium-term production planning is crucial for resource allocation and maximum utilization of manufacturing capacities. If the efficiency of the production units is predicted reliably, the company can operate more economically due to predictability. Automotive companies usually monitor their efficiency and productivity using the Overall Equipment Effectiveness (OEE) as a standard Key Performance Indicator. This article presents a new approach in which the OEE value is predicted using different weights, target values and historical time data. The aim of this article is to determine the weight combination that allows for the most accurate prediction for three types of welding technologies. Firstly, a literature review demonstrates scientific relevance. Secondly, the proposed algorithm is described. In the third section, the prediction algorithm is presented through a case study. Several different weight combinations are applied and then compared using the Root Mean Square Error indicator. Last section concludes the paper. The presented algorithm can be easily and quickly applied in many cases of industrial environment.

Authors

Institutions

Publication Details

Journal
Acta Technica Jaurinensis
Published
2025-12-04
DOI
https://doi.org/10.14513/actatechjaur.00781
Primary Topic
Forecasting Techniques and Applications
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Weight and target value-based algorithm for predicting Overall Equipment Effectiveness

Péter Dobra
Acta Technica Jaurinensis
Forecasting Techniques and Applications
article

Weight and target value-based algorithm for predicting Overall Equipment Effectiveness

Péter Dobra
article en

Abstract

For industrial companies, accurate short and medium-term production planning is crucial for resource allocation and maximum utilization of manufacturing capacities. If the efficiency of the production units is predicted reliably, the company can operate more economically due to predictability. Automotive companies usually monitor their efficiency and productivity using the Overall Equipment Effectiveness (OEE) as a standard Key Performance Indicator. This article presents a new approach in which the OEE value is predicted using different weights, target values and historical time data. The aim of this article is to determine the weight combination that allows for the most accurate prediction for three types of welding technologies. Firstly, a literature review demonstrates scientific relevance. Secondly, the proposed algorithm is described. In the third section, the prediction algorithm is presented through a case study. Several different weight combinations are applied and then compared using the Root Mean Square Error indicator. Last section concludes the paper. The presented algorithm can be easily and quickly applied in many cases of industrial environment.

Acta Technica JaurinensisVol. 19(1)
Kaali Institute (HU)
Openalex Percentile: Top 56%
Forecasting Techniques and Applications
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.