Damage-based cost recovery and equitable tolling: a Shapley value model linking ESAL factors to highway fee structures in Nigeria

Nigeria's reintroduction of toll gates on federal highways through public-private partnerships (PPPs) aims to address chronic funding gaps for road rehabilitation and maintenance. However, the current flat-rate tolling policy is inequitable because vehicle types impose widely varying degrees of pavement damage, largely driven by axle load configuration [1]. This study develops and applies a differentiated tolling framework for the Abuja–Lokoja highway using cooperative game theory, specifically the Shapley value method [2, 3], to allocate maintenance costs proportionally across vehicle categories based on their marginal damage contributions. Traffic volume data, axle configurations, and Equivalent Single Axle Load (ESAL) factors for five vehicle categories (2A, 3A, 4A, 5A, 6A) were obtained from Federal agencies, namely: Federal Roads maintenance Agency (FERMA), Federal Roads Safety Corps (FRSC), and Federal Ministry of Works (FMW) [4, 5, 6]. The Shapley value model was applied to compute equitable toll rates ranging from ₦9,932 (≈$6.62) for two-axle vehicles to ₦72,629 (≈$48.42) for six-axle trucks, reflecting a 7.3:1 damage ratio. Coalition analysis revealed that six-axle vehicles alone contribute 52.10% of the total pavement damage, while representing only 39.8% of the traffic volume. In contrast, the government's announced flat-rate structure (₦500-₦1,600) significantly underprices heavy vehicles and fails to recover maintenance costs. The proposed framework demonstrates that damage-based tolling enhances equity, ensures sustainable cost recovery, and creates proper economic incentives for the preservation of infrastructure. Implementation requires electronic toll collection (ETC) and weigh-in-motion (WIM) technologies, supported by transparent governance mechanisms to prevent revenue misappropriation. These findings provide an actuarially efficient and scientifically defensible foundation for an equitable PPP toll policy in Nigeria and similar developing country contexts.

Authors

Publication Details

Journal
Transport technologies
Published
2025-12-04
DOI
https://doi.org/10.23939/tt2025.02.023
Primary Topic
Infrastructure Maintenance and Monitoring
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Damage-based cost recovery and equitable tolling: a Shapley value model linking ESAL factors to highway fee structures in Nigeria

Abdulmalik Muhammad Mustapha, Donatus Eberechukwu Onwuegbuchunam, Innocent Chuka Ogwude, Harrison O. Amuji et al.
Transport technologies
Infrastructure Maintenance and Monitoring
article

Damage-based cost recovery and equitable tolling: a Shapley value model linking ESAL factors to highway fee structures in Nigeria

Abdulmalik Muhammad Mustapha, Donatus Eberechukwu Onwuegbuchunam, Innocent Chuka Ogwude, Harrison O. Amuji, Kenneth U. Nnadi, Kenneth Okechukwu Okeke, Asuquo Okon Bassey
article en

Abstract

Nigeria's reintroduction of toll gates on federal highways through public-private partnerships (PPPs) aims to address chronic funding gaps for road rehabilitation and maintenance. However, the current flat-rate tolling policy is inequitable because vehicle types impose widely varying degrees of pavement damage, largely driven by axle load configuration [1]. This study develops and applies a differentiated tolling framework for the Abuja–Lokoja highway using cooperative game theory, specifically the Shapley value method [2, 3], to allocate maintenance costs proportionally across vehicle categories based on their marginal damage contributions. Traffic volume data, axle configurations, and Equivalent Single Axle Load (ESAL) factors for five vehicle categories (2A, 3A, 4A, 5A, 6A) were obtained from Federal agencies, namely: Federal Roads maintenance Agency (FERMA), Federal Roads Safety Corps (FRSC), and Federal Ministry of Works (FMW) [4, 5, 6]. The Shapley value model was applied to compute equitable toll rates ranging from ₦9,932 (≈$6.62) for two-axle vehicles to ₦72,629 (≈$48.42) for six-axle trucks, reflecting a 7.3:1 damage ratio. Coalition analysis revealed that six-axle vehicles alone contribute 52.10% of the total pavement damage, while representing only 39.8% of the traffic volume. In contrast, the government's announced flat-rate structure (₦500-₦1,600) significantly underprices heavy vehicles and fails to recover maintenance costs. The proposed framework demonstrates that damage-based tolling enhances equity, ensures sustainable cost recovery, and creates proper economic incentives for the preservation of infrastructure. Implementation requires electronic toll collection (ETC) and weigh-in-motion (WIM) technologies, supported by transparent governance mechanisms to prevent revenue misappropriation. These findings provide an actuarially efficient and scientifically defensible foundation for an equitable PPP toll policy in Nigeria and similar developing country contexts.

Transport technologiesVol. 6(2)
Openalex Percentile: Top 61%
Infrastructure Maintenance and Monitoring
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.