Advanced digital solutions for construction waste management: A 4D BIM integrated scenario analysis

Construction generates substantial material waste with environmental and economic impacts, yet current methods rarely integrate waste estimation with project schedules. This study develops and validates semi-automated 4D BIM framework that links element-level quantities to standardized resource specifications — CSI MasterFormat and the Iranian Cost Estimation Standard (ICES) — and propagates material-specific waste factors into a time-phased (Autodesk Navisworks Timeliner) analysis. Two custom applications (“Material-DB” and “Waste-Estimation”) import ICES items, map them to MasterFormat codes, compute waste by unit (area/volume/mass), and populate BIM parameters that are visualized over the construction programme. A municipal office project in Tehran ( ≈ 6800 m 2 , four floors) is used for validation. BIM-based estimates align with observed site waste within ≤ 17% deviation across key streams (e.g., concrete −7.6%, masonry −14.0%, tiles +8.0%, iron −16.7%), with concrete waste peaking early during foundations and primary envelopes. Five design/material scenarios demonstrate how the method supports fast scenario testing and cost appraisal; for example, Scenario 3 yields the lowest waste cost, whereas Scenarios 5 and 2 are highest. The framework enables schedule-aware waste planning, targeted design changes (e.g., exterior wall systems, stone/tile use), and routine waste audits, offering a replicable path towards time-cost-waste trade-off decisions in early project phases. • 4D BIM links element-level waste to the construction schedule. • Dual mapping to MasterFormat and ICES standardizes waste codes. • Time-phased waste charts reveal material peaks for site logistics. • Scenarios compare material options by waste volume and waste cost.

Authors

Publication Details

Journal
Green Technologies and Sustainability
Published
2025-12-02
DOI
https://doi.org/10.1016/j.grets.2025.100318
Citations
1
Primary Topic
Recycled Aggregate Concrete Performance
Type
article
Field-Weighted Citation Impact
1.01
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Advanced digital solutions for construction waste management: A 4D BIM integrated scenario analysis

Abdulwahed Fazeli, Saeed Reza Mohandes, Saeed Banihashemi, Khuong LeNguyen
1 citations
Green Technologies and Sustainability
Recycled Aggregate Concrete Performance
1.01
article

Advanced digital solutions for construction waste management: A 4D BIM integrated scenario analysis

Abdulwahed Fazeli, Saeed Reza Mohandes, Saeed Banihashemi, Khuong LeNguyen
article en
1 citations

Abstract

Construction generates substantial material waste with environmental and economic impacts, yet current methods rarely integrate waste estimation with project schedules. This study develops and validates semi-automated 4D BIM framework that links element-level quantities to standardized resource specifications — CSI MasterFormat and the Iranian Cost Estimation Standard (ICES) — and propagates material-specific waste factors into a time-phased (Autodesk Navisworks Timeliner) analysis. Two custom applications (“Material-DB” and “Waste-Estimation”) import ICES items, map them to MasterFormat codes, compute waste by unit (area/volume/mass), and populate BIM parameters that are visualized over the construction programme. A municipal office project in Tehran ( ≈ 6800 m 2 , four floors) is used for validation. BIM-based estimates align with observed site waste within ≤ 17% deviation across key streams (e.g., concrete −7.6%, masonry −14.0%, tiles +8.0%, iron −16.7%), with concrete waste peaking early during foundations and primary envelopes. Five design/material scenarios demonstrate how the method supports fast scenario testing and cost appraisal; for example, Scenario 3 yields the lowest waste cost, whereas Scenarios 5 and 2 are highest. The framework enables schedule-aware waste planning, targeted design changes (e.g., exterior wall systems, stone/tile use), and routine waste audits, offering a replicable path towards time-cost-waste trade-off decisions in early project phases. • 4D BIM links element-level waste to the construction schedule. • Dual mapping to MasterFormat and ICES standardizes waste codes. • Time-phased waste charts reveal material peaks for site logistics. • Scenarios compare material options by waste volume and waste cost.

Green Technologies and SustainabilityVol. 4(2)
Openalex Percentile: Top 18%
Recycled Aggregate Concrete Performance
1.01
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.