Integrated capacity planning and multi-project scheduling considering resource transfer and idleness

This paper develops a dual-level framework addressing resource allocation and scheduling challenges in customer-driven production systems involving multi-mode projects with predefined release/due dates. At the tactical level, global resources undergo time-dependent allocation across projects, with transfer costs incurred during dynamic redistribution. Operational-level scheduling utilises these allocations for detailed sub-project execution. The objective minimises total costs encompassing transfer, idle, and indirect expenses. To streamline resource transfers, we introduce a novel 'blocking' strategy that partitions time-varying allocations into distinct 'resource blocks'. We propose an adaptive large neighbourhood search (ALNS) and genetic algorithm (GA) featuring a 'project macro-mode - activity sequence - activity mode' hybrid encoding that integrates operational objectives within the tactical framework. Numerical studies confirm the superiority of ALNS, demonstrating it achieves 92% faster computation than CPLEX on small-scale instances while maintaining only a 0.47% optimality gap, reduces costs by up to 13.2% versus GA across 80 test instances, and shows particularly high efficacy in resource-constrained scenarios. The framework demonstrates significant potential for application in complex manufacturing environments like engineer-to-order and make-to-order production, directly contributing to reduced lead times, lower costs, and improved system throughput. Sensitivity analysis provides actionable insights on cost-drivers for production and project management practitioners.

Authors

Institutions

Publication Details

Journal
International Journal of Production Research
Published
2025-12-01
DOI
https://doi.org/10.1080/00207543.2025.2596241
Citations
2
Primary Topic
Resource-Constrained Project Scheduling
Type
article
Field-Weighted Citation Impact
4.21

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Integrated capacity planning and multi-project scheduling considering resource transfer and idleness

Jianjiang Wang, Mario Vanhoucke, Zhongbao Zhou, Yuhao Wang et al.
2 citations
International Journal of Production Research
Resource-Constrained Project Scheduling
4.21
article

Integrated capacity planning and multi-project scheduling considering resource transfer and idleness

Jianjiang Wang, Mario Vanhoucke, Zhongbao Zhou, Yuhao Wang, Xuejun Hu
article en
2 citations

Abstract

This paper develops a dual-level framework addressing resource allocation and scheduling challenges in customer-driven production systems involving multi-mode projects with predefined release/due dates. At the tactical level, global resources undergo time-dependent allocation across projects, with transfer costs incurred during dynamic redistribution. Operational-level scheduling utilises these allocations for detailed sub-project execution. The objective minimises total costs encompassing transfer, idle, and indirect expenses. To streamline resource transfers, we introduce a novel 'blocking' strategy that partitions time-varying allocations into distinct 'resource blocks'. We propose an adaptive large neighbourhood search (ALNS) and genetic algorithm (GA) featuring a 'project macro-mode - activity sequence - activity mode' hybrid encoding that integrates operational objectives within the tactical framework. Numerical studies confirm the superiority of ALNS, demonstrating it achieves 92% faster computation than CPLEX on small-scale instances while maintaining only a 0.47% optimality gap, reduces costs by up to 13.2% versus GA across 80 test instances, and shows particularly high efficacy in resource-constrained scenarios. The framework demonstrates significant potential for application in complex manufacturing environments like engineer-to-order and make-to-order production, directly contributing to reduced lead times, lower costs, and improved system throughput. Sensitivity analysis provides actionable insights on cost-drivers for production and project management practitioners.

International Journal of Production Research
Hunan University (CN), National University of Defense Technology (CN), Ghent University Hospital (BE), Vlerick Business School (BE), University College London (GB)
National Natural Science Foundation of China, Natural Science Foundation of Hunan Province, Office of Naval Research
Openalex Percentile: Top 5%
Resource-Constrained Project Scheduling
4.21
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.