Optimal sizing of renewable hybrid power plants considering component reliability as a multi-discipline optimization under uncertainty

The sizing of grid-connected hybrid power plants (HPPs), integrating wind, photovoltaics (PV), and battery storage, is critical for optimizing economic performance. Traditional sizing approaches typically assume ideal component availability, neglecting failure and repair processes, which can lead to overestimated financial projections. This paper develops a stochastic reliability model to simulate component availability time series over the plant’s lifetime, considering wind turbines, PV strings, PV inverters, battery systems, and transformers. The sizing problem is formulated as a multi-disciplinary optimization under uncertainty, incorporating 13 design variables, including wind turbine rated power, number of turbines, installation density, PV capacity, inverter size etc. The optimization aims to maximize the weighted average of expected net present value (NPV) over capital expenditure (CAPEX) and the conditional value-at-risk of NPV over CAPEX. The proposed methodology is applied to case studies at a Danish and a French site with diverse weather conditions to compare deterministic and stochastic sizing approaches. The out-of-sample experiments demonstrate that incorporating component reliability in the sizing process increases the mean NPV-to-CAPEX ratio, evaluated over 100 reliability scenarios, by 2.5 % and 2.8 % for the two sites, respectively, indicating enhanced investment efficiency. • Optimal sizing model for renewable hybrid power plants with component reliability. • Stochastic multi-discipline optimization under uncertainty. • A stochastic simulation model to generate component availability time series. • Open-source tool HyDesign for practical deployment in HPP design and evaluation.

Authors

Publication Details

Journal
Applied Energy
Published
2025-12-01
DOI
https://doi.org/10.1016/j.apenergy.2025.127138
Primary Topic
Hybrid Renewable Energy Systems
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Optimal sizing of renewable hybrid power plants considering component reliability as a multi-discipline optimization under uncertainty

Rujie Zhu, Mikkel Friis-Møller, Kaushik Das, Juan Pablo Murcia León et al.
Applied Energy
Hybrid Renewable Energy Systems
article

Optimal sizing of renewable hybrid power plants considering component reliability as a multi-discipline optimization under uncertainty

Rujie Zhu, Mikkel Friis-Møller, Kaushik Das, Juan Pablo Murcia León, Megha Gupta
article en

Abstract

The sizing of grid-connected hybrid power plants (HPPs), integrating wind, photovoltaics (PV), and battery storage, is critical for optimizing economic performance. Traditional sizing approaches typically assume ideal component availability, neglecting failure and repair processes, which can lead to overestimated financial projections. This paper develops a stochastic reliability model to simulate component availability time series over the plant’s lifetime, considering wind turbines, PV strings, PV inverters, battery systems, and transformers. The sizing problem is formulated as a multi-disciplinary optimization under uncertainty, incorporating 13 design variables, including wind turbine rated power, number of turbines, installation density, PV capacity, inverter size etc. The optimization aims to maximize the weighted average of expected net present value (NPV) over capital expenditure (CAPEX) and the conditional value-at-risk of NPV over CAPEX. The proposed methodology is applied to case studies at a Danish and a French site with diverse weather conditions to compare deterministic and stochastic sizing approaches. The out-of-sample experiments demonstrate that incorporating component reliability in the sizing process increases the mean NPV-to-CAPEX ratio, evaluated over 100 reliability scenarios, by 2.5 % and 2.8 % for the two sites, respectively, indicating enhanced investment efficiency. • Optimal sizing model for renewable hybrid power plants with component reliability. • Stochastic multi-discipline optimization under uncertainty. • A stochastic simulation model to generate component availability time series. • Open-source tool HyDesign for practical deployment in HPP design and evaluation.

Applied EnergyVol. 404
Openalex Percentile: Top 59%
Hybrid Renewable Energy Systems
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Optimal sizing of renewable hybrid power plants considering component reliability as a multi-discipline optimization under uncertainty — Rujie Zhu, Mikkel Friis-Møller, et al. · Applied Energy (2025) | TGRS Research Map | TGRS