Multi-objective scheduling optimization of prefabricated construction projects based on improved NSGA-II

The existing multi-objective scheduling optimization methods for prefabricated construction projects do not consider scheduling problems under uncertain project structures, and the efficiency of the scheduled projects is not ideal. To address this issue, a multi-objective scheduling optimization method grounded on an improved Nondominated Sorting Genetic Algorithm II (NSGA-II) is proposed. The study first establishes a multi-objective optimization mathematical model considering the uncertainty of project structure from the perspective of changes in project structure. This model aims to minimize project cost and duration, considering various execution modes and uncertainties of activity processes in prefabricated construction projects. Afterwards, by introducing the NSGA-II and taboo search algorithm, the scheduling problem of the construction project is optimized and solved to obtain the best scheduling solution. The results showed that after using this optimization method, the resource utilization rate of the project was 92.36%, the material cost consumption was 158.60 yuan/m 2 , and the completion rate of the construction period was 98.77%. Its progress deviation rate was only 2.41%, and the unit area cost was 1850.32 yuan/m 2 , which has a higher cost-effectiveness compared to other methods. The engineering qualification rate of the application project was 99.78%. The research designs a multi-objective scheduling optimization method for prefabricated construction projects, which can effectively improve project construction efficiency and reduce costs while ensuring construction quality.

Authors

Institutions

Publication Details

Journal
International Journal of Architectural Computing
Published
2025-12-01
DOI
https://doi.org/10.1177/14780771251405439
Primary Topic
Resource-Constrained Project Scheduling
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Multi-objective scheduling optimization of prefabricated construction projects based on improved NSGA-II

Ruifang Chen
International Journal of Architectural Computing
Resource-Constrained Project Scheduling
article

Multi-objective scheduling optimization of prefabricated construction projects based on improved NSGA-II

Ruifang Chen
article en

Abstract

The existing multi-objective scheduling optimization methods for prefabricated construction projects do not consider scheduling problems under uncertain project structures, and the efficiency of the scheduled projects is not ideal. To address this issue, a multi-objective scheduling optimization method grounded on an improved Nondominated Sorting Genetic Algorithm II (NSGA-II) is proposed. The study first establishes a multi-objective optimization mathematical model considering the uncertainty of project structure from the perspective of changes in project structure. This model aims to minimize project cost and duration, considering various execution modes and uncertainties of activity processes in prefabricated construction projects. Afterwards, by introducing the NSGA-II and taboo search algorithm, the scheduling problem of the construction project is optimized and solved to obtain the best scheduling solution. The results showed that after using this optimization method, the resource utilization rate of the project was 92.36%, the material cost consumption was 158.60 yuan/m 2 , and the completion rate of the construction period was 98.77%. Its progress deviation rate was only 2.41%, and the unit area cost was 1850.32 yuan/m 2 , which has a higher cost-effectiveness compared to other methods. The engineering qualification rate of the application project was 99.78%. The research designs a multi-objective scheduling optimization method for prefabricated construction projects, which can effectively improve project construction efficiency and reduce costs while ensuring construction quality.

International Journal of Architectural Computing
Zhengzhou University of Science and Technology (CN)
Openalex Percentile: Top 57%
Resource-Constrained Project Scheduling
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.