Optimal Solutions of Economic Lot Scheduling Problem with Energy and Power Costs

This paper proposes a new planning method for a cyclic production of many different products with steady demand and variable production rates, which minimises energy consumption while reducing and equalising power demand. The problem is modelled as the Economic Lot Scheduling Problem (elsp), with a common production cycle for all products. This paper shows that the problem can be optimally solved by a general-purpose mathematical programming solver in a short time by reformulating the general non-linear model into a Mixed-Integer Quadratically Constrained Programming (miqcp) model. This way, there is no need to develop a specialised algorithm, which requires a high level of expertise and is very labour-intensive. The proposed approach is also the only method that allows finding optimal solutions for the general case of the common-cycle elsp with variable production rates. For a problem instance known from the literature, the optimal solution ensured a reduction in the power demand cost by 10.7%, and in the total cost by 3.3%. Moreover, experiments proved that production rate lower bounds are critical for the choice of solution.

Authors

Institutions

Publication Details

Journal
Energies
Published
2025-11-27
DOI
https://doi.org/10.3390/en18236234
Citations
1
Primary Topic
Supply Chain and Inventory Management
Type
article
Field-Weighted Citation Impact
2.28
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Optimal Solutions of Economic Lot Scheduling Problem with Energy and Power Costs

Waldemar Kaczmarczyk
1 citations
Energies
Supply Chain and Inventory Management
2.28
article

Optimal Solutions of Economic Lot Scheduling Problem with Energy and Power Costs

Waldemar Kaczmarczyk
article en
1 citations

Abstract

This paper proposes a new planning method for a cyclic production of many different products with steady demand and variable production rates, which minimises energy consumption while reducing and equalising power demand. The problem is modelled as the Economic Lot Scheduling Problem (elsp), with a common production cycle for all products. This paper shows that the problem can be optimally solved by a general-purpose mathematical programming solver in a short time by reformulating the general non-linear model into a Mixed-Integer Quadratically Constrained Programming (miqcp) model. This way, there is no need to develop a specialised algorithm, which requires a high level of expertise and is very labour-intensive. The proposed approach is also the only method that allows finding optimal solutions for the general case of the common-cycle elsp with variable production rates. For a problem instance known from the literature, the optimal solution ensured a reduction in the power demand cost by 10.7%, and in the total cost by 3.3%. Moreover, experiments proved that production rate lower bounds are critical for the choice of solution.

EnergiesVol. 18(23)
University of Agriculture in Krakow (PL), AGH University of Krakow (PL)
Openalex Percentile: Top 8%
Supply Chain and Inventory Management
2.28
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.