Bi-Objective Optimization with Mode-Oriented Genetic Algorithm for Multi-Mode Resource-Constrained Project Scheduling

To address the time–cost trade-off challenge in real-world practices, a bi-objective optimization model of the Multi-mode Resource-Constrained Project Scheduling Problem is proposed with simultaneously minimizing both the project makespan and the resource cost. A mode-oriented Non-dominated Sorting Genetic Algorithm II is developed to solve the formulated problem. Two key improvements are introduced: a mode-repair mechanism is incorporated during the initialization phase to generate feasible execution modes, thereby improving the quality of initial solutions and accelerating search efficiency, and four neighborhood structures based on mode and task execution lists are designed for local search, enabling fine-grained solution refinement in each iteration. Extensive experimental studies are conducted to verify the effectiveness of the proposed strategies, and comparative evaluations with state-of-the-art algorithms demonstrate that MNSGA-II achieves superior performance across multiple metrics, including lower mean ideal distance, better solution quality, improved diversity, and more uniform distribution of Pareto-optimal solutions.

Authors

Institutions

Publication Details

Journal
Algorithms
Published
2025-11-27
DOI
https://doi.org/10.3390/a18120746
Primary Topic
Resource-Constrained Project Scheduling
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Bi-Objective Optimization with Mode-Oriented Genetic Algorithm for Multi-Mode Resource-Constrained Project Scheduling

Min Xia, Jintao Chen, Guokai Liang, Rui Tong et al.
Algorithms
Resource-Constrained Project Scheduling
article

Bi-Objective Optimization with Mode-Oriented Genetic Algorithm for Multi-Mode Resource-Constrained Project Scheduling

Min Xia, Jintao Chen, Guokai Liang, Rui Tong, Weihua Tan, Xin Xie, Jianxin Zhu, Yuting Liu
article en

Abstract

To address the time–cost trade-off challenge in real-world practices, a bi-objective optimization model of the Multi-mode Resource-Constrained Project Scheduling Problem is proposed with simultaneously minimizing both the project makespan and the resource cost. A mode-oriented Non-dominated Sorting Genetic Algorithm II is developed to solve the formulated problem. Two key improvements are introduced: a mode-repair mechanism is incorporated during the initialization phase to generate feasible execution modes, thereby improving the quality of initial solutions and accelerating search efficiency, and four neighborhood structures based on mode and task execution lists are designed for local search, enabling fine-grained solution refinement in each iteration. Extensive experimental studies are conducted to verify the effectiveness of the proposed strategies, and comparative evaluations with state-of-the-art algorithms demonstrate that MNSGA-II achieves superior performance across multiple metrics, including lower mean ideal distance, better solution quality, improved diversity, and more uniform distribution of Pareto-optimal solutions.

AlgorithmsVol. 18(12)
Hunan University of Science and Technology (CN), Hunan University (CN), Sanya University (CN), China Southern Power Grid (China) (CN), South China University of Technology (CN)
National Natural Science Foundation of China, China Southern Power Grid
Openalex Percentile: Top 58%
Resource-Constrained Project Scheduling
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.