From Capability Integration to Value Co-Creation: A Case Study on the Dynamic Capability Mechanisms of the F+EPC+O Model in Super-High-Rise Projects

As one of the most technically and managerially complex types of construction projects, super-high-rise buildings require deep multidisciplinary integration and intensive collaboration throughout their lifecycle. Conventional stage-based delivery models, such as the EPC, are often inadequate for handling this complexity. In recent years, the integrated Financing–Engineering, Procurement and Construction–Operation (F+EPC+O) model has emerged to address lifecycle governance challenges in building projects. This study explores how an investment-led F+EPC+O model builds dynamic capabilities to enable lifecycle collaboration in complex projects. It is based on a case study of the Xiamen Hemei Center and employs a qualitative case study approach to examine the operation of an internal F+EPC+O in the project. Drawing on multi-source data, including internal archives, BIM/CIM logs, and interviews, the findings identify three elements—lifecycle incentive alignment, internal power symmetry, and extended operation duration—that shape the Sensing–Seizing–Reconfiguring (SSR) capabilities of the approach. Specifically, Sensing is achieved through NPV-based decision frameworks and cross-stage trade-off lists; Seizing is achieved through BIM/CIM issue closure and joint rapid-cycle decision-making; and Reconfiguring is achieved through performance feedback and institutionalized knowledge repositories. The findings indicate that the SSR dynamic cycle transforms institutional integration into value co-creation, turning project complexity into a source of collaborative advantage.

Authors

Institutions

Publication Details

Journal
Buildings
Published
2025-11-25
DOI
https://doi.org/10.3390/buildings15234258
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

From Capability Integration to Value Co-Creation: A Case Study on the Dynamic Capability Mechanisms of the F+EPC+O Model in Super-High-Rise Projects

Minfeng Yao, Qing‐Hua Xu, Qi Zhang, Hongjiao Lin et al.
Buildings
BIM and Construction Integration
article

From Capability Integration to Value Co-Creation: A Case Study on the Dynamic Capability Mechanisms of the F+EPC+O Model in Super-High-Rise Projects

Minfeng Yao, Qing‐Hua Xu, Qi Zhang, Hongjiao Lin, Pan Ji, Yu Su
article en

Abstract

As one of the most technically and managerially complex types of construction projects, super-high-rise buildings require deep multidisciplinary integration and intensive collaboration throughout their lifecycle. Conventional stage-based delivery models, such as the EPC, are often inadequate for handling this complexity. In recent years, the integrated Financing–Engineering, Procurement and Construction–Operation (F+EPC+O) model has emerged to address lifecycle governance challenges in building projects. This study explores how an investment-led F+EPC+O model builds dynamic capabilities to enable lifecycle collaboration in complex projects. It is based on a case study of the Xiamen Hemei Center and employs a qualitative case study approach to examine the operation of an internal F+EPC+O in the project. Drawing on multi-source data, including internal archives, BIM/CIM logs, and interviews, the findings identify three elements—lifecycle incentive alignment, internal power symmetry, and extended operation duration—that shape the Sensing–Seizing–Reconfiguring (SSR) capabilities of the approach. Specifically, Sensing is achieved through NPV-based decision frameworks and cross-stage trade-off lists; Seizing is achieved through BIM/CIM issue closure and joint rapid-cycle decision-making; and Reconfiguring is achieved through performance feedback and institutionalized knowledge repositories. The findings indicate that the SSR dynamic cycle transforms institutional integration into value co-creation, turning project complexity into a source of collaborative advantage.

BuildingsVol. 15(23)
Huaqiao University (CN), Xiamen University (CN)
Openalex Percentile: Top 60%
BIM and Construction Integration
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.