Adopting Large Language Models in the Construction Industry: Drivers, Barriers, and Strategic Implications from China

The rapid advancement of AI, especially large language models (LLMs), brings opportunities and challenges to industries. In construction, LLMs can enhance project coordination, support decision-making and reduce workload, but adoption is limited by hallucination, data security and domain complexity. This study investigates the current state of LLM adoption in China’s construction industry through a four-step approach, including a comprehensive literature review to identify potential drivers and barriers, questionnaire design and data collection for empirical analysis, and the application of the Entropy Weight Method (EWM) to quantify and rank the relative importance of each factor. The findings reveal that the top drivers originate at the company level, including strategic partnerships, internal research teams, and staff training—highlighting the central role of organizational readiness in enabling LLM integration. Conversely, the most critical barriers are embedded in the construction domain itself, including knowledge gaps, workflow integration, and data heterogeneity, which reflect structural limitations in the sector. Although LLM implementation remains in its early stages, survey responses show widespread optimism among stakeholders regarding its future potential. The study proposes several actionable strategies for both construction firms and policymakers to facilitate effective LLM adoption. Moreover, the identified drivers and barriers are not exclusive to construction but are also relevant to other digitally transforming sectors—such as manufacturing, healthcare, and energy—offering broader implications for AI adoption in complex, project-based environments.

Authors

Institutions

Publication Details

Journal
Buildings
Published
2025-11-27
DOI
https://doi.org/10.3390/buildings15234296
Citations
1
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
1.01
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Adopting Large Language Models in the Construction Industry: Drivers, Barriers, and Strategic Implications from China

Liang Ma, Longhui Liao, Jiajuan Tan, Chengke Wu et al.
1 citations
Buildings
BIM and Construction Integration
1.01
article

Adopting Large Language Models in the Construction Industry: Drivers, Barriers, and Strategic Implications from China

Liang Ma, Longhui Liao, Jiajuan Tan, Chengke Wu, Zhile Yang, Rui Jiang, Xinyu Zhao
article en
1 citations

Abstract

The rapid advancement of AI, especially large language models (LLMs), brings opportunities and challenges to industries. In construction, LLMs can enhance project coordination, support decision-making and reduce workload, but adoption is limited by hallucination, data security and domain complexity. This study investigates the current state of LLM adoption in China’s construction industry through a four-step approach, including a comprehensive literature review to identify potential drivers and barriers, questionnaire design and data collection for empirical analysis, and the application of the Entropy Weight Method (EWM) to quantify and rank the relative importance of each factor. The findings reveal that the top drivers originate at the company level, including strategic partnerships, internal research teams, and staff training—highlighting the central role of organizational readiness in enabling LLM integration. Conversely, the most critical barriers are embedded in the construction domain itself, including knowledge gaps, workflow integration, and data heterogeneity, which reflect structural limitations in the sector. Although LLM implementation remains in its early stages, survey responses show widespread optimism among stakeholders regarding its future potential. The study proposes several actionable strategies for both construction firms and policymakers to facilitate effective LLM adoption. Moreover, the identified drivers and barriers are not exclusive to construction but are also relevant to other digitally transforming sectors—such as manufacturing, healthcare, and energy—offering broader implications for AI adoption in complex, project-based environments.

BuildingsVol. 15(23)
Shanghai University (CN), Shenzhen University (CN), Chinese Academy of Sciences (CN), Shenzhen Institutes of Advanced Technology (CN)
Openalex Percentile: Top 18%
BIM and Construction Integration
1.01
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.