Consolidation of the Superconducting Circuits Energy Extraction Systems at the Large Hadron Collider

At the beginning of the next long shutdown, foreseen mid 2026, the Large Hadron Collider (LHC) will have been in operation for almost 20 years. After this period, the operation of the present Energy Extraction (EE) systems, that are part of the protection of the superconducting circuits of the LHC, will present significant challenges. As many system components will have exceeded their expected lifetimes, the risks of failure, system degradation, and obsolescence increase, ultimately compromising operational performance and safety. Although preventive maintenance is regularly performed on the EE facilities, an extensive consolidation program of these facilities has started, to improve their dependability and assure their performance till the end of operation of the LHC. This paper illustrates the two projects of consolidation of the 600 A and 13 kA EE systems, which aim to modernize and optimize these systems, ensuring that they continue to provide reliable protection while reducing maintenance costs and integrating the latest advances in materials, control technologies, and diagnostics, together with enhanced safety.

Authors

Institutions

Publication Details

Journal
IEEE Transactions on Applied Superconductivity
Published
2025-11-24
DOI
https://doi.org/10.1109/tasc.2025.3633645
Primary Topic
Superconducting Materials and Applications
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Consolidation of the Superconducting Circuits Energy Extraction Systems at the Large Hadron Collider

B. Panev, Mirko Pojer, Stephen Pemberton, D. Carrillo et al.
IEEE Transactions on Applied Superconductivity
Superconducting Materials and Applications
article

Consolidation of the Superconducting Circuits Energy Extraction Systems at the Large Hadron Collider

B. Panev, Mirko Pojer, Stephen Pemberton, D. Carrillo, M. Grigorov, Spyridon Georgakakis, Vasja Pirc, Gert-Jan Coelingh, Andrea Donato, Jan-Erik Aas
article en

Abstract

At the beginning of the next long shutdown, foreseen mid 2026, the Large Hadron Collider (LHC) will have been in operation for almost 20 years. After this period, the operation of the present Energy Extraction (EE) systems, that are part of the protection of the superconducting circuits of the LHC, will present significant challenges. As many system components will have exceeded their expected lifetimes, the risks of failure, system degradation, and obsolescence increase, ultimately compromising operational performance and safety. Although preventive maintenance is regularly performed on the EE facilities, an extensive consolidation program of these facilities has started, to improve their dependability and assure their performance till the end of operation of the LHC. This paper illustrates the two projects of consolidation of the 600 A and 13 kA EE systems, which aim to modernize and optimize these systems, ensuring that they continue to provide reliable protection while reducing maintenance costs and integrating the latest advances in materials, control technologies, and diagnostics, together with enhanced safety.

IEEE Transactions on Applied SuperconductivityVol. 36(3)
European Organization for Nuclear Research (CH)
Openalex Percentile: Top 64%
Superconducting Materials and Applications
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.