Supply Chain Mitigation for Shipbuilding in Indonesia Shipyard by using Bayesian Network

The implementation of modular construction in shipbuilding is increasing production by approximately 50%. However, supply chain remains a critical component of the project, particularly in the material inventory system, which significantly affects shipbuilding process. Delays in supply chain are caused by various factors, including a limited number of goods or service providers, changes in material or service specifications, supplier challenges, cash flow limitations, failed negotiations, incomplete documentation, customs clearance, failure to optimize networks and procurement system, redundant or unordered materials, limited storage capacity, insufficient transportation equipment, and high maintenance costs. Therefore, this study aims to introduce a new method for evaluating supply chain performance in Indonesian shipbuilding industry. Using Bayesian Network (BN) method, the evaluation process started by identifying constraint factors, assessing the probability, mapping associated risks, and providing mitigation strategies to enhance supply chain performance in support of new ship construction. The results showed that the procurement of materials, specifically sensors, weapons, communication system, as well as electrical and electronic components, carried the highest risk. These items were difficult to procure because of sudden specification changes and complex technical requirements. Project schedules often deviated from plans, causing an increase in equipment costs and procurement, as well as extended times. Consequently, early coordination between the procurement, planning, and supplier divisions is recommended to confirm and lock in equipment specifications, minimizing disruptions.

Authors

Institutions

Publication Details

Journal
Transactions on Maritime Science
Published
2025-07-25
DOI
https://doi.org/10.7225/toms.v14.n03.w07
Primary Topic
Supply Chain Resilience and Risk Management
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Supply Chain Mitigation for Shipbuilding in Indonesia Shipyard by using Bayesian Network

Intan Baroroh
Transactions on Maritime Science
Supply Chain Resilience and Risk Management
article

Supply Chain Mitigation for Shipbuilding in Indonesia Shipyard by using Bayesian Network

Intan Baroroh
article en

Abstract

The implementation of modular construction in shipbuilding is increasing production by approximately 50%. However, supply chain remains a critical component of the project, particularly in the material inventory system, which significantly affects shipbuilding process. Delays in supply chain are caused by various factors, including a limited number of goods or service providers, changes in material or service specifications, supplier challenges, cash flow limitations, failed negotiations, incomplete documentation, customs clearance, failure to optimize networks and procurement system, redundant or unordered materials, limited storage capacity, insufficient transportation equipment, and high maintenance costs. Therefore, this study aims to introduce a new method for evaluating supply chain performance in Indonesian shipbuilding industry. Using Bayesian Network (BN) method, the evaluation process started by identifying constraint factors, assessing the probability, mapping associated risks, and providing mitigation strategies to enhance supply chain performance in support of new ship construction. The results showed that the procurement of materials, specifically sensors, weapons, communication system, as well as electrical and electronic components, carried the highest risk. These items were difficult to procure because of sudden specification changes and complex technical requirements. Project schedules often deviated from plans, causing an increase in equipment costs and procurement, as well as extended times. Consequently, early coordination between the procurement, planning, and supplier divisions is recommended to confirm and lock in equipment specifications, minimizing disruptions.

Transactions on Maritime ScienceVol. 14(3)
Universitas Hang Tuah (ID)
Openalex Percentile: Top 48%
Supply Chain Resilience and Risk Management
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Supply Chain Mitigation for Shipbuilding in Indonesia Shipyard by using Bayesian Network — Intan Baroroh · Transactions on Maritime Science (2025) | TGRS Research Map | TGRS