Long distance laying technology of casing for connected roadway directional borehole in underground coal mine and its application

Aiming at the problem of long distance laying of casing for connected roadway directional borehole in underground coal mine, the bending capacity and passing capacity of casing were calculated and analyzed with the large diameter casing of Ф219 × 8.94 mm as the research object. The stress situation in the process of casing running was studied, and the supporting pipe jacking machine was developed and the engineering test was carried out. The results show that the limit dog leg of the casing string is 5.512°/30 m. The smaller borehole diameter has high requirements for dogleg control, and the larger borehole diameter increases the drilling difficulty. The preferred borehole diameter is 330 mm. The casing laying scheme of ' drill machine pulling back + pipe jacking machine pushing ' is put forward. The casing pushing and pulling process should be matched with thrust and tension. Focus on the design of horizontal telescopic guide rail propulsion system and mobile centralizer and clamping release system, the supporting pipe jacking machine was developed. The engineering test was carried out in the directional long borehole between Daliuta Mine and Huojitu Mine. The casing running and cementing achieved good results. The research results can provide reference for the implementation of similar projects.

Authors

Institutions

Publication Details

Journal
Frontiers in Built Environment
Published
2025-11-26
DOI
https://doi.org/10.3389/fbuil.2025.1671058
Primary Topic
Geomechanics and Mining Engineering
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Long distance laying technology of casing for connected roadway directional borehole in underground coal mine and its application

Yijun He, Haitao Mo, Zhibin Li, Guo Li et al.
Frontiers in Built Environment
Geomechanics and Mining Engineering
article

Long distance laying technology of casing for connected roadway directional borehole in underground coal mine and its application

Yijun He, Haitao Mo, Zhibin Li, Guo Li, Xiongwei Li, Gao Kuiying
article en

Abstract

Aiming at the problem of long distance laying of casing for connected roadway directional borehole in underground coal mine, the bending capacity and passing capacity of casing were calculated and analyzed with the large diameter casing of Ф219 × 8.94 mm as the research object. The stress situation in the process of casing running was studied, and the supporting pipe jacking machine was developed and the engineering test was carried out. The results show that the limit dog leg of the casing string is 5.512°/30 m. The smaller borehole diameter has high requirements for dogleg control, and the larger borehole diameter increases the drilling difficulty. The preferred borehole diameter is 330 mm. The casing laying scheme of ' drill machine pulling back + pipe jacking machine pushing ' is put forward. The casing pushing and pulling process should be matched with thrust and tension. Focus on the design of horizontal telescopic guide rail propulsion system and mobile centralizer and clamping release system, the supporting pipe jacking machine was developed. The engineering test was carried out in the directional long borehole between Daliuta Mine and Huojitu Mine. The casing running and cementing achieved good results. The research results can provide reference for the implementation of similar projects.

Frontiers in Built EnvironmentVol. 11
China XD Group (China) (CN), China Shenhua Energy (China) (CN)
Openalex Percentile: Top 59%
Geomechanics and Mining Engineering
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.