Preliminary calibration procedure for the Phase1 neutron and gamma-ray diagnostics of the Divertor Tokamak Test (DTT) facility

• Absolute calibration of DTT NAS & NYM with 252 Cf & 14 MeV compact neutron generator. • NAS: 4 vertical positions below each irradiation end, ≤1 % error on counts. • NYM: central-ring scan with 12 positions on equatorial plane, ≤3 % error on counts. • Expected count rates calculated combining MCNP fluxes & detector characteristics. • MCNP simulations optimize source placement and irradiation time for calibration. Neutron and gamma-ray diagnostics are of key importance for measuring neutron and gamma-ray yields, fluxes and neutron energy distribution in a tokamak. Their calibration is critical for accurate measurements in fusion devices such as the Divertor Tokamak Test (DTT) facility, to be constructed at Frascati in Italy. This paper presents the preliminary calibration procedure for the Neutron Yield Monitors (NYM) and Neutron Activation System (NAS) of this machine. Using neutron sources such as ²⁵²Cf and a Deuterium-Tritium compact neutron generator, the calibration process involves detailed MCNP simulations to optimize source placement and measurement duration. Drawing insights from other devices like the Joint European Torus and the Frascati Tokamak Upgrade, the paper explores various calibration scenarios to enhance experimental time efficiency. A staggered approach is proposed, in which the DD calibration is scheduled after the installation of the larger components in the tokamak, and the DT calibration, if necessary, will be postponed before the start-up of the high-power operations where the triton burn-up component is expected to be much higher than during the low-power phase. This strategy reduces resource demand for the start-up phase and allows for ongoing research to improve the calibration process and diagnostic performance of DTT.

Authors

Institutions

Publication Details

Journal
Fusion Engineering and Design
Published
2025-11-26
DOI
https://doi.org/10.1016/j.fusengdes.2025.115537
Primary Topic
Magnetic confinement fusion research
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Preliminary calibration procedure for the Phase1 neutron and gamma-ray diagnostics of the Divertor Tokamak Test (DTT) facility

M. Angelone, M. Gelfusa, D. Flammini, A. Colangeli et al.
Fusion Engineering and Design
Magnetic confinement fusion research
article

Preliminary calibration procedure for the Phase1 neutron and gamma-ray diagnostics of the Divertor Tokamak Test (DTT) facility

M. Angelone, M. Gelfusa, D. Flammini, A. Colangeli, Fabio Panza, Giada Gandolfo, M. Pillon, D. Marocco, V. Anagnostopoulou
article en

Abstract

• Absolute calibration of DTT NAS & NYM with 252 Cf & 14 MeV compact neutron generator. • NAS: 4 vertical positions below each irradiation end, ≤1 % error on counts. • NYM: central-ring scan with 12 positions on equatorial plane, ≤3 % error on counts. • Expected count rates calculated combining MCNP fluxes & detector characteristics. • MCNP simulations optimize source placement and irradiation time for calibration. Neutron and gamma-ray diagnostics are of key importance for measuring neutron and gamma-ray yields, fluxes and neutron energy distribution in a tokamak. Their calibration is critical for accurate measurements in fusion devices such as the Divertor Tokamak Test (DTT) facility, to be constructed at Frascati in Italy. This paper presents the preliminary calibration procedure for the Neutron Yield Monitors (NYM) and Neutron Activation System (NAS) of this machine. Using neutron sources such as ²⁵²Cf and a Deuterium-Tritium compact neutron generator, the calibration process involves detailed MCNP simulations to optimize source placement and measurement duration. Drawing insights from other devices like the Joint European Torus and the Frascati Tokamak Upgrade, the paper explores various calibration scenarios to enhance experimental time efficiency. A staggered approach is proposed, in which the DD calibration is scheduled after the installation of the larger components in the tokamak, and the DT calibration, if necessary, will be postponed before the start-up of the high-power operations where the triton burn-up component is expected to be much higher than during the low-power phase. This strategy reduces resource demand for the start-up phase and allows for ongoing research to improve the calibration process and diagnostic performance of DTT.

Fusion Engineering and DesignVol. 222
National Agency for New Technologies, Energy and Sustainable Economic Development (IT), University of Rome Tor Vergata (IT), Istituto Nazionale di Fisica Nucleare, Sezione di Genova (IT), Istituto Nazionale di Fisica Nucleare, Laboratori Nazionali di Frascati (IT)
Openalex Percentile: Top 84%
Magnetic confinement fusion research
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.