Adaptação da metodologia Last Planner System para o planejamento e controle de projetos industriais de engenharia: um estudo de caso

Context. The Last Planner System (LPS), originally developed for construction, has proved effective in reducing waste and increasing efficiency in project planning and control. This study examined the adaptation of LPS to industrial engineering projects. Objective. To assess LPS’s contribution to efficiency, productivity, and resource management in an engineering context. Method. Case study with two-time windows: February–April 2024 and April–July 2024. LPS routines were implemented, including look ahead meetings, and indicators such as Percentage of Package Completed (PPC) and document advancement across two baselines were monitored. Results. PPC fell within ranges considered acceptable for construction, indicating good performance of the adaptation during the engineering phase. Look ahead meetings brought forward 6 documents in baseline 1 and 36 in baseline 2, helping to reduce schedule deviations. Conclusion. Adapting LPS to the industrial engineering context proved promising. Ongoing adjustments and close monitoring are reinforced as essential to maximise the performance of future projects.

Authors

Institutions

Publication Details

Journal
Brazilian Journal of Production Engineering
Published
2025-11-25
DOI
https://doi.org/10.47456/bjpe.v11i4.50049
Primary Topic
Academic Research in Diverse Fields
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Adaptação da metodologia Last Planner System para o planejamento e controle de projetos industriais de engenharia: um estudo de caso

Felipe Nunes, Cristina Guimarães César, Lara Teixeira Maciel Trajano
Brazilian Journal of Production Engineering
Academic Research in Diverse Fields
article

Adaptação da metodologia Last Planner System para o planejamento e controle de projetos industriais de engenharia: um estudo de caso

Felipe Nunes, Cristina Guimarães César, Lara Teixeira Maciel Trajano
article en

Abstract

Context. The Last Planner System (LPS), originally developed for construction, has proved effective in reducing waste and increasing efficiency in project planning and control. This study examined the adaptation of LPS to industrial engineering projects. Objective. To assess LPS’s contribution to efficiency, productivity, and resource management in an engineering context. Method. Case study with two-time windows: February–April 2024 and April–July 2024. LPS routines were implemented, including look ahead meetings, and indicators such as Percentage of Package Completed (PPC) and document advancement across two baselines were monitored. Results. PPC fell within ranges considered acceptable for construction, indicating good performance of the adaptation during the engineering phase. Look ahead meetings brought forward 6 documents in baseline 1 and 36 in baseline 2, helping to reduce schedule deviations. Conclusion. Adapting LPS to the industrial engineering context proved promising. Ongoing adjustments and close monitoring are reinforced as essential to maximise the performance of future projects.

Brazilian Journal of Production EngineeringVol. 11(4)
Universidade do Estado de Minas Gerais (BR), Federal Center for Technological Education of Minas Gerais (BR)
Openalex Percentile: Top 62%
Academic Research in Diverse Fields
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.