Adaptação da metodologia Last Planner System para o planejamento e controle de projetos industriais de engenharia: um estudo de caso
Context. The Last Planner System (LPS), originally developed for construction, has proved effective in reducing waste and increasing efficiency in project planning and control. This study examined the adaptation of LPS to industrial engineering projects. Objective. To assess LPS’s contribution to efficiency, productivity, and resource management in an engineering context. Method. Case study with two-time windows: February–April 2024 and April–July 2024. LPS routines were implemented, including look ahead meetings, and indicators such as Percentage of Package Completed (PPC) and document advancement across two baselines were monitored. Results. PPC fell within ranges considered acceptable for construction, indicating good performance of the adaptation during the engineering phase. Look ahead meetings brought forward 6 documents in baseline 1 and 36 in baseline 2, helping to reduce schedule deviations. Conclusion. Adapting LPS to the industrial engineering context proved promising. Ongoing adjustments and close monitoring are reinforced as essential to maximise the performance of future projects.
Authors
- Felipe Nunes (ORCID: https://orcid.org/0000-0002-9083-9250)
- Cristina Guimarães César (ORCID: https://orcid.org/0000-0002-8703-6844)
- Lara Teixeira Maciel Trajano
Institutions
- Universidade do Estado de Minas Gerais (BR)
- Federal Center for Technological Education of Minas Gerais (BR)
Publication Details
- Journal
- Brazilian Journal of Production Engineering
- Published
- 2025-11-25
- DOI
- https://doi.org/10.47456/bjpe.v11i4.50049
- Primary Topic
- Academic Research in Diverse Fields
- Type
- article
- Field-Weighted Citation Impact
- 0.00