Evaluation of Construction Methods for Ultra-High Performance Concrete Invert Linings in Corrugated Metal Pipe Culverts

Corrugated metal pipe (CMP) culverts are key pieces of infrastructure in drainage and waterway management, but many are reaching their end of life and require rehabilitation. While existing repair methods have a long track record of success, they can be cost prohibitive and may significantly affect the hydraulic properties of culverts. Ultra-high performance concrete is internally reinforced, stronger, and more durable than conventional concrete, offering a modern solution to culvert deterioration. The seven mockups described include trials with top-formed UHPC, thixotropic UHPC, and a UHPC shotcrete placement. Shotcrete UHPC was not found to be viable at this time due to challenges with maintaining mix consistency and adhesion to the substrate. Top forming and thixotropic UHPC were found to be the best options for building a consistent invert lining for culvert rehabilitation but posed unique challenges in design, construction, and material consistency. This paper describes the methods of construction, challenges during construction, and the results of each test. It is the author’s intent to give owners a new tool for culvert rehabilitation, provide designers with each of the variables in implementation, and help contractors mitigate risks by discussing the challenges encountered for UHPC invert linings.

Authors

Institutions

Publication Details

Journal
Infrastructures
Published
2025-11-25
DOI
https://doi.org/10.3390/infrastructures10120322
Primary Topic
Geotechnical Engineering and Underground Structures
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Evaluation of Construction Methods for Ultra-High Performance Concrete Invert Linings in Corrugated Metal Pipe Culverts

Alexandra Hain, Brian Lassy
Infrastructures
Geotechnical Engineering and Underground Structures
article

Evaluation of Construction Methods for Ultra-High Performance Concrete Invert Linings in Corrugated Metal Pipe Culverts

Alexandra Hain, Brian Lassy
article en

Abstract

Corrugated metal pipe (CMP) culverts are key pieces of infrastructure in drainage and waterway management, but many are reaching their end of life and require rehabilitation. While existing repair methods have a long track record of success, they can be cost prohibitive and may significantly affect the hydraulic properties of culverts. Ultra-high performance concrete is internally reinforced, stronger, and more durable than conventional concrete, offering a modern solution to culvert deterioration. The seven mockups described include trials with top-formed UHPC, thixotropic UHPC, and a UHPC shotcrete placement. Shotcrete UHPC was not found to be viable at this time due to challenges with maintaining mix consistency and adhesion to the substrate. Top forming and thixotropic UHPC were found to be the best options for building a consistent invert lining for culvert rehabilitation but posed unique challenges in design, construction, and material consistency. This paper describes the methods of construction, challenges during construction, and the results of each test. It is the author’s intent to give owners a new tool for culvert rehabilitation, provide designers with each of the variables in implementation, and help contractors mitigate risks by discussing the challenges encountered for UHPC invert linings.

InfrastructuresVol. 10(12)
University of Connecticut (US)
U.S. Department of Transportation, State of Connecticut Department of Transportation
Openalex Percentile: Top 62%
Geotechnical Engineering and Underground Structures
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Evaluation of Construction Methods for Ultra-High Performance Concrete Invert Linings in Corrugated Metal Pipe Culverts — Alexandra Hain, Brian Lassy · Infrastructures (2025) | TGRS Research Map | TGRS