Doubling Throughput and Halving Project Durations: Lessons from Intel’s OCF Strategy for Project Portfolio Management

Effective project portfolio management strategies are critical for managing complex projects across various industries and organizations. The optimized cycle-time flow (OCF) strategy was designed within Intel to predictably reduce project cycle times and increase throughput for complex installation, deinstallation, and design projects in industrial plants. Built on seven principles, it aims to enhance strategic alignment and optimize collaborative planning and execution. This study examines the implementation of OCF across multiple case studies within the construction of two of Intel’s semiconductor fabrication plants, saving hundreds of millions of dollars that would have been wasted by traditional acceleration actions and halving the time to market for new technologies. Results from implementation on 642 installation projects, 503 deinstallation projects, and 335 design projects showed cycle-time reductions of up to 49%, 43%, and 41%, respectively. Effective and committed leadership was critical in scaling up implementation. The results highlight the effectiveness of OCF in diverse project environments, demonstrating its capability to streamline project execution and improve overall efficiency.

Authors

Institutions

Publication Details

Journal
Journal of Construction Engineering and Management
Published
2025-11-25
DOI
https://doi.org/10.1061/jcemd4.coeng-16441
Primary Topic
Resource-Constrained Project Scheduling
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Doubling Throughput and Halving Project Durations: Lessons from Intel’s OCF Strategy for Project Portfolio Management

Doron S. Gabai, Norman Wong, Rafael Sacks, Eran Haronian et al.
Journal of Construction Engineering and Management
Resource-Constrained Project Scheduling
article

Doubling Throughput and Halving Project Durations: Lessons from Intel’s OCF Strategy for Project Portfolio Management

Doron S. Gabai, Norman Wong, Rafael Sacks, Eran Haronian, Nikita S. Kennard, Mark K. Miera, Tabitha D. Cloyd
article en

Abstract

Effective project portfolio management strategies are critical for managing complex projects across various industries and organizations. The optimized cycle-time flow (OCF) strategy was designed within Intel to predictably reduce project cycle times and increase throughput for complex installation, deinstallation, and design projects in industrial plants. Built on seven principles, it aims to enhance strategic alignment and optimize collaborative planning and execution. This study examines the implementation of OCF across multiple case studies within the construction of two of Intel’s semiconductor fabrication plants, saving hundreds of millions of dollars that would have been wasted by traditional acceleration actions and halving the time to market for new technologies. Results from implementation on 642 installation projects, 503 deinstallation projects, and 335 design projects showed cycle-time reductions of up to 49%, 43%, and 41%, respectively. Effective and committed leadership was critical in scaling up implementation. The results highlight the effectiveness of OCF in diverse project environments, demonstrating its capability to streamline project execution and improve overall efficiency.

Journal of Construction Engineering and ManagementVol. 152(2)
Intel (United States) (US), Technion – Israel Institute of Technology (IL), Ariel University (IL)
Openalex Percentile: Top 58%
Resource-Constrained Project Scheduling
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Doubling Throughput and Halving Project Durations: Lessons from Intel’s OCF Strategy for Project Portfolio Management — Doron S. Gabai, Norman Wong, et al. · Journal of Construction Engineering and Management (2025) | TGRS Research Map | TGRS