Investigating the feasible configurational paths in selecting project delivery method between design-bid-build and design-build

Purpose Scholars have proposed various quantitative and qualitative methods for evaluating criteria affecting the selection of project delivery method (PDM). However, these approaches often focus on individual perspectives, lacking a holistic perspective. To address this, this study employed qualitative comparative analysis (QCA) to investigate the configurational impact of critical criteria affecting the selection between design-bid-build (DBB) and design-build (DB). Design/methodology/approach Collecting data from 20 DBB cases and 20 DB cases in China and South Korea, we applied the fuzzy-set QCA model from three perspectives: the entire dataset, division between the two countries and the segmentation between owners and contractors. Findings First, with the whole data’s analysis, the results show that DBB emerges as the preferred option when project performance objectives are inconsequential or when projects face substantial regulatory issues and intricate project management problems. Conversely, DB is selected for projects that exhibit complexity or significant project management issues with the high-ability owner and high-project performance objectives. Second, the findings indicate that both countries prioritize project characteristics and project performance objectives when selecting DB, no matter how other criteria exist. Third, the result reveals a similarity in one path between owners and contractors, characterized by the presence of project performance objectives and the absence of the other four criteria. Originality/value This study provided insights into the criteria influencing PDM selection from a comprehensive perspective, serving as a decision support tool for owners facing similar construction projects.

Authors

Institutions

Publication Details

Journal
Engineering Construction & Architectural Management
Published
2025-11-25
DOI
https://doi.org/10.1108/ecam-11-2024-1527
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Investigating the feasible configurational paths in selecting project delivery method between design-bid-build and design-build

Hui Li, Fei Kang, Zhufeng Li
Engineering Construction & Architectural Management
Construction Project Management and Performance
article

Investigating the feasible configurational paths in selecting project delivery method between design-bid-build and design-build

Hui Li, Fei Kang, Zhufeng Li
article en

Abstract

Purpose Scholars have proposed various quantitative and qualitative methods for evaluating criteria affecting the selection of project delivery method (PDM). However, these approaches often focus on individual perspectives, lacking a holistic perspective. To address this, this study employed qualitative comparative analysis (QCA) to investigate the configurational impact of critical criteria affecting the selection between design-bid-build (DBB) and design-build (DB). Design/methodology/approach Collecting data from 20 DBB cases and 20 DB cases in China and South Korea, we applied the fuzzy-set QCA model from three perspectives: the entire dataset, division between the two countries and the segmentation between owners and contractors. Findings First, with the whole data’s analysis, the results show that DBB emerges as the preferred option when project performance objectives are inconsequential or when projects face substantial regulatory issues and intricate project management problems. Conversely, DB is selected for projects that exhibit complexity or significant project management issues with the high-ability owner and high-project performance objectives. Second, the findings indicate that both countries prioritize project characteristics and project performance objectives when selecting DB, no matter how other criteria exist. Third, the result reveals a similarity in one path between owners and contractors, characterized by the presence of project performance objectives and the absence of the other four criteria. Originality/value This study provided insights into the criteria influencing PDM selection from a comprehensive perspective, serving as a decision support tool for owners facing similar construction projects.

Engineering Construction & Architectural Management
Yanbian University Hospital (CN), Technische Universität Berlin (DE), Beijing University of Civil Engineering and Architecture (CN)
Openalex Percentile: Top 58%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.