Random coordination mechanism for scheduling games with machine modification

This paper studies the Random coordination mechanism for scheduling games with machine modification. A set of jobs is to be processed on a set of identical machines. An initial schedule before the modification of machines is given as a prior. Subsequently, some machines are removed and some new machines are added. Each job has the right either to stay on its original machine if the machine is not removed, or to move to another machine. If a job changes its machine, it will be behind all the jobs previously scheduled on the target machine. For two jobs moving to the same machine or remaining on the same machine, each has an equal probability of being ahead of the other. The individual cost of each job is its completion time, while the social cost is defined as the maximal load of all the machines. We present properties of Nash Equilibrium and establish Price of Anarchy of the game. The bounds are tight for each combination of the number of final machines, added machines and removed machines.

Authors

Institutions

Publication Details

Journal
Discrete Applied Mathematics
Published
2025-11-24
DOI
https://doi.org/10.1016/j.dam.2025.11.038
Primary Topic
Game Theory and Applications
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Random coordination mechanism for scheduling games with machine modification

Zhiyi Tan, Chaoyu He
Discrete Applied Mathematics
Game Theory and Applications
article

Random coordination mechanism for scheduling games with machine modification

Zhiyi Tan, Chaoyu He
article en

Abstract

This paper studies the Random coordination mechanism for scheduling games with machine modification. A set of jobs is to be processed on a set of identical machines. An initial schedule before the modification of machines is given as a prior. Subsequently, some machines are removed and some new machines are added. Each job has the right either to stay on its original machine if the machine is not removed, or to move to another machine. If a job changes its machine, it will be behind all the jobs previously scheduled on the target machine. For two jobs moving to the same machine or remaining on the same machine, each has an equal probability of being ahead of the other. The individual cost of each job is its completion time, while the social cost is defined as the maximal load of all the machines. We present properties of Nash Equilibrium and establish Price of Anarchy of the game. The bounds are tight for each combination of the number of final machines, added machines and removed machines.

Discrete Applied MathematicsVol. 382
Zhejiang University (CN)
Openalex Percentile: Top 58%
Game Theory and Applications
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Random coordination mechanism for scheduling games with machine modification — Zhiyi Tan, Chaoyu He · Discrete Applied Mathematics (2025) | TGRS Research Map | TGRS