Synergy mapping-informed learning rate estimation for bipolar membrane electrodialysis in carbon dioxide removal
Delivering cost-effective carbon dioxide removal (CDR) will require rapid cost declines in emerging options that still face large technical and market uncertainty. We develop a synergy mapping framework that turns this uncertainty into a set of managed risks by making explicit where bipolar membrane electrodialysis (BMED) for CO 2 removal can co-learn and co-scale with more mature electrochemical systems, notably electrodialysis and electrolyzers, and where BMED needs bespoke innovation. We use two complementary estimates to manage uncertainty: a top-down inversion sets LR targets consistent with a 100 $/tCO₂ levelized cost under established net-zero scenarios, while a bottom-up aggregation, informed by synergy mapping, estimates the achievable LR from transferable components. Top-down yields a goal LR band of 10.74–21.84 % across 2030 and 2050 at 5–100 % shares; bottom-up gives an achievable 12.3 % (with a 95 % confidence interval of 12.24 % - 12.29 %). Overlaying them shows feasibility by 2050 at 25–100 % share, and shortfalls at 5 % in 2050 and all 2030 scenarios, driven by limited early cumulative capacity and BPM bottlenecks. To close gaps, leveraging shared manufacturing expertise from ED and electrolyzers and roll-to-roll membrane scale-up, such as BMED-specific gaps (water-splitting catalyst innovation and BPM production capacity), remain critical. By making explicit where knowledge transfer is feasible and where novel research is still needed, this framework provides practical guidance for stakeholders aiming to bring BMED-CDR to commercial readiness while advancing the technical maturity. • Introduce synergy mapping as a new comparative framework to accelerate BMED-CDR cost reductions. • Conduct the first top-down and bottom-up learning curve analysis of BMED-CDR. • Top-down yields a goal learning rate (LR) band of 10.74–21.84 % across 2030 and 2050 at 5–100 % shares. • Bottom-up gives an achievable LR of 12.3 %. • Feasible by 2050 at 25 -100 %, but shortfalls at 5 % and all 2030 cases from limited capacity and BPM limits.
Authors
- Wei He (ORCID: https://orcid.org/0000-0003-4274-9661)
- Ruoqing Wang
Institutions
- King's College London (GB)
Publication Details
- Journal
- Applied Energy
- Published
- 2025-11-12
- DOI
- https://doi.org/10.1016/j.apenergy.2025.127058
- Primary Topic
- Membrane-based Ion Separation Techniques
- Type
- article
- Field-Weighted Citation Impact
- 0.00
Funders
- UK Research and Innovation
- Royal Academy of Engineering
- Engineering and Physical Sciences Research Council
- Chinese Government Scholarship