Advancing Digital Project Management Through AI: An Interpretable POA-LightGBM Framework for Cost Overrun Prediction

Cost overruns remain one of the most persistent challenges in construction and infrastructure project management, often undermining efficiency, sustainability, and stakeholder trust. With the rise of digital transformation, artificial intelligence (AI) and machine learning (ML) provide new opportunities to enhance predictive decision-making and strengthen project control. This study introduces a digital project management framework that integrates the Pelican Optimization Algorithm (POA) with Light Gradient Boosting Machine (LGBM) to deliver reliable and interpretable cost overrun forecasting. The proposed POA-LightGBM model leverages metaheuristic-driven hyperparameter optimization to improve predictive performance and generalization. A comprehensive evaluation using multiple error metrics Coefficient of Determination (R2), Root Mean Squared Error (RMSE), Mean Absolute Error (MAE), and Mean Absolute Percentage Error (MAPE) demonstrates that POA-LGBM significantly outperformed baseline LGBM and alternative metaheuristic configurations, achieving an average R2 of 0.9786. To support transparency in digital project environments, SHapley Additive exPlanations (SHAPs) were employed to identify dominant drivers of cost overruns, including actual project cost, energy consumption, schedule deviation, and material usage. By embedding AI-enabled predictive analytics into digital project management practices, this study contributes to advancing digital transformation in project delivery, offering actionable insights for cost control, risk management, and sustainable infrastructure development.

Authors

Institutions

Publication Details

Journal
Systems
Published
2025-11-21
DOI
https://doi.org/10.3390/systems13121047
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Advancing Digital Project Management Through AI: An Interpretable POA-LightGBM Framework for Cost Overrun Prediction

Opeoluwa Seun Ojekemi, Jalal Meftah Mohamed Lekraik
Systems
BIM and Construction Integration
article

Advancing Digital Project Management Through AI: An Interpretable POA-LightGBM Framework for Cost Overrun Prediction

Opeoluwa Seun Ojekemi, Jalal Meftah Mohamed Lekraik
article en

Abstract

Cost overruns remain one of the most persistent challenges in construction and infrastructure project management, often undermining efficiency, sustainability, and stakeholder trust. With the rise of digital transformation, artificial intelligence (AI) and machine learning (ML) provide new opportunities to enhance predictive decision-making and strengthen project control. This study introduces a digital project management framework that integrates the Pelican Optimization Algorithm (POA) with Light Gradient Boosting Machine (LGBM) to deliver reliable and interpretable cost overrun forecasting. The proposed POA-LightGBM model leverages metaheuristic-driven hyperparameter optimization to improve predictive performance and generalization. A comprehensive evaluation using multiple error metrics Coefficient of Determination (R2), Root Mean Squared Error (RMSE), Mean Absolute Error (MAE), and Mean Absolute Percentage Error (MAPE) demonstrates that POA-LGBM significantly outperformed baseline LGBM and alternative metaheuristic configurations, achieving an average R2 of 0.9786. To support transparency in digital project environments, SHapley Additive exPlanations (SHAPs) were employed to identify dominant drivers of cost overruns, including actual project cost, energy consumption, schedule deviation, and material usage. By embedding AI-enabled predictive analytics into digital project management practices, this study contributes to advancing digital transformation in project delivery, offering actionable insights for cost control, risk management, and sustainable infrastructure development.

SystemsVol. 13(12)
University of Mediterranean Karpasia (CY)
Openalex Percentile: Top 62%
BIM and Construction Integration
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.