Integrated decision-making for cable crane group dispatch in high arch dams using multi-scale simulation

In high arch dam construction, multiple cable cranes are often deployed to pour multiple blocks simultaneously to accelerate progress. In such scenarios, traditional dispatching methods often overlook the integrated decision-making required between the Match of Blocks and Cranes (MBC) and Pouring Operation Planning (POP), impairing the balance of progress, safety, and quality. This paper proposes a multi-scale simulation framework that integrates Discrete Event Simulation (DES) and Agent-Based Simulation (ABS) to model pouring processes at block and crane scales, enabling unified decision-making of MBC and POP. Agent-based mechanism generated POPs for each MBC by accurately predicting crane efficiency, rationally allocating unloading zones, and coordinating parallel operations under safety and quality constraints. An arch dam construction case demonstrated that the proposed framework reduced the construction period by approximately one month and improved average monthly pouring intensity by 5.56% compared to single-scale simulation, while enhancing task balance over the manual dispatching method. • Integrated decision-making tool for cable crane group dispatch optimizing arch dam progress, safety, and quality. • Multi-scale framework using DES and ABS for scientific cable crane dispatch planning. • Data-driven hybrid prediction model combining probabilistic and Random Forest methods for crane efficiency.

Authors

Publication Details

Journal
Automation in Construction
Published
2025-11-20
DOI
https://doi.org/10.1016/j.autcon.2025.106643
Primary Topic
Hydraulic and Pneumatic Systems
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Integrated decision-making for cable crane group dispatch in high arch dams using multi-scale simulation

Yihong Zhou, Xiang Zheng, Chunju Zhao, Junliang He et al.
Automation in Construction
Hydraulic and Pneumatic Systems
article

Integrated decision-making for cable crane group dispatch in high arch dams using multi-scale simulation

Yihong Zhou, Xiang Zheng, Chunju Zhao, Junliang He, Junwu Xiong, Fang Wang
article en

Abstract

In high arch dam construction, multiple cable cranes are often deployed to pour multiple blocks simultaneously to accelerate progress. In such scenarios, traditional dispatching methods often overlook the integrated decision-making required between the Match of Blocks and Cranes (MBC) and Pouring Operation Planning (POP), impairing the balance of progress, safety, and quality. This paper proposes a multi-scale simulation framework that integrates Discrete Event Simulation (DES) and Agent-Based Simulation (ABS) to model pouring processes at block and crane scales, enabling unified decision-making of MBC and POP. Agent-based mechanism generated POPs for each MBC by accurately predicting crane efficiency, rationally allocating unloading zones, and coordinating parallel operations under safety and quality constraints. An arch dam construction case demonstrated that the proposed framework reduced the construction period by approximately one month and improved average monthly pouring intensity by 5.56% compared to single-scale simulation, while enhancing task balance over the manual dispatching method. • Integrated decision-making tool for cable crane group dispatch optimizing arch dam progress, safety, and quality. • Multi-scale framework using DES and ABS for scientific cable crane dispatch planning. • Data-driven hybrid prediction model combining probabilistic and Random Forest methods for crane efficiency.

Automation in ConstructionVol. 181
Openalex Percentile: Top 63%
Hydraulic and Pneumatic Systems
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Integrated decision-making for cable crane group dispatch in high arch dams using multi-scale simulation — Yihong Zhou, Xiang Zheng, et al. · Automation in Construction (2025) | TGRS Research Map | TGRS