Detailed assessment of combustion risk and PAR efficiency in the late phase of a severe accident within the European AMHYCO project
D.C. Visser, L. Maas, A. Iskra, Zhe Liang et al.
Journal
Nuclear Engineering and Design
Topics
Risk and Safety Analysis
article
Detailed assessment of combustion risk and PAR efficiency in the late phase of a severe accident within the European AMHYCO project
D.C. Visser, L. Maas, A. Iskra, Zhe Liang, L.E. Herranz, Johannes Hoffrichter, Stephan Kelm, Luis M. Serra, O. Sevbo, Araceli Domínguez-Bugarín, Carlos Vázquez-Rodríguez, A. Bleyer, F.S.L. Pangukir, Gonzalo Jiménez Varas, Ivo Kljenak, Joan Fontanet, Michael Klauck, Nabiha Chaumeix, Ahmed Bentaïb, Matthias Braun, Miriam Müer, Leticia Vitores
article en
Abstract
No abstract available for this paper.
Publication Tag
Nuclear Engineering and DesignVol. 446
Institutions
Forschungszentrum Jülich (DE), Jožef Stefan Institute (SI), CEA Paris-Saclay - Etablissement de Fontenay-aux-roses (FR), Framatome (Germany) (DE), CEA Cadarache (FR), Energostal (Ukraine) (UA), Institut de Combustion Aérothermique Réactivité et Environnement (FR), Centro de Investigaciones Energéticas, Medioambientales y Tecnológicas (ES), Canadian Nuclear Laboratories (CA), Nuclear Research and Consultancy Group (NL), Universidad Politécnica de Madrid (ES), Ruhr University Bochum (DE)