Unified tail assignment and maintenance task scheduling: A decision support framework for improved efficiency and stability

Flight and maintenance scheduling pose conflicting objectives: while maintenance is vital for ensuring aircraft airworthiness, it comes at the cost of taking aircraft out of operation. In current operations, airlines manually handle tail assignment and maintenance task scheduling separately, missing an opportunity to strike a better balance. This division leads to wasted maintenance resources, restricted fleet availability for schedule flexibility, inconsistent planning, and neglect of schedule resilience. This study presents a novel approach that integrates tail assignment and maintenance scheduling into a unified decision-support framework. An integer program, tailored to meet airline-specific requirements and constraints, is combined with an innovative time-space network (TSN). The TSN incorporates two distinct spaces for maintenance and network activities. The primary objective is to generate feasible plans that increase schedule efficiency (i.e., no cancellations, high fleet availability, high fleet health, and optimal use of maintenance resources) and schedule stability (i.e., limited number of late arrival disruptions during operations) the day before operation. Additionally, this framework addresses overlooked aspects in the literature: it treats maintenance tasks as variable interval activities based on aircraft-specific needs, departing from the traditional fixed interval approach. The performance of the framework is tested with real-data provided by a major European single hub-to-spoke airline, with a heterogeneous fleet of over 50 wide-body aircraft. Historical data from arrival delays is used to create robust buffers that mitigate delay propagation. A 17% reduction in maintenance time was achieved compared to the airline’s current plans, resulting in a 10% increase in fleet availability on the day of operations. This improvement is attributed to higher labour and task interval utilization, indicating the framework’s superior efficiency in scheduling maintenance tasks. Lastly, the framework produced plans more resilient to arrival delays, reducing the number of disruptions and delay propagation over 40%. This framework can be used as a decision-support tool for airlines, enabling the creation of schedules that are both robust against delays and optimized for fleet utilization. • Unified tail assignment and maintenance scheduling framework for decision-support. • Time-space network with distinct spaces for maintenance and network. • Robust ground arcs are created based on historical delays to mitigate delay propagation. • Tested with real-data by a major European hub-to-spoke airline with a heterogeneous fleet. • Plans from the framework reduce disruptions and delay propagation over 40%.

Authors

Institutions

Publication Details

Journal
Operations Research Perspectives
Published
2025-11-20
DOI
https://doi.org/10.1016/j.orp.2025.100363
Primary Topic
Air Traffic Management and Optimization
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Unified tail assignment and maintenance task scheduling: A decision support framework for improved efficiency and stability

Bruno F. Santos, Marta Ribeiro, Luigi Pescio
Operations Research Perspectives
Air Traffic Management and Optimization
article

Unified tail assignment and maintenance task scheduling: A decision support framework for improved efficiency and stability

Bruno F. Santos, Marta Ribeiro, Luigi Pescio
article en

Abstract

Flight and maintenance scheduling pose conflicting objectives: while maintenance is vital for ensuring aircraft airworthiness, it comes at the cost of taking aircraft out of operation. In current operations, airlines manually handle tail assignment and maintenance task scheduling separately, missing an opportunity to strike a better balance. This division leads to wasted maintenance resources, restricted fleet availability for schedule flexibility, inconsistent planning, and neglect of schedule resilience. This study presents a novel approach that integrates tail assignment and maintenance scheduling into a unified decision-support framework. An integer program, tailored to meet airline-specific requirements and constraints, is combined with an innovative time-space network (TSN). The TSN incorporates two distinct spaces for maintenance and network activities. The primary objective is to generate feasible plans that increase schedule efficiency (i.e., no cancellations, high fleet availability, high fleet health, and optimal use of maintenance resources) and schedule stability (i.e., limited number of late arrival disruptions during operations) the day before operation. Additionally, this framework addresses overlooked aspects in the literature: it treats maintenance tasks as variable interval activities based on aircraft-specific needs, departing from the traditional fixed interval approach. The performance of the framework is tested with real-data provided by a major European single hub-to-spoke airline, with a heterogeneous fleet of over 50 wide-body aircraft. Historical data from arrival delays is used to create robust buffers that mitigate delay propagation. A 17% reduction in maintenance time was achieved compared to the airline’s current plans, resulting in a 10% increase in fleet availability on the day of operations. This improvement is attributed to higher labour and task interval utilization, indicating the framework’s superior efficiency in scheduling maintenance tasks. Lastly, the framework produced plans more resilient to arrival delays, reducing the number of disruptions and delay propagation over 40%. This framework can be used as a decision-support tool for airlines, enabling the creation of schedules that are both robust against delays and optimized for fleet utilization. • Unified tail assignment and maintenance scheduling framework for decision-support. • Time-space network with distinct spaces for maintenance and network. • Robust ground arcs are created based on historical delays to mitigate delay propagation. • Tested with real-data by a major European hub-to-spoke airline with a heterogeneous fleet. • Plans from the framework reduce disruptions and delay propagation over 40%.

Operations Research PerspectivesVol. 15
Delft University of Technology (NL)
Openalex Percentile: Top 54%
Air Traffic Management and Optimization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.