Modeling the strategies and criteria for construction readiness in BIM-based projects

Purpose Building information modeling (BIM)-based projects that are not ready for construction can lead to project delays and cost overruns. However, projects often start without adequate readiness, despite the negative impacts of starting too early. Developing proper strategies to achieve the criteria for construction readiness in BIM-based projects is essential to ensure successful project execution. Therefore, this study aims to model the relationship between critical strategies and critical criteria for construction readiness in BIM-based projects. To achieve this aim, the study objectives are to identify critical strategies and critical criteria for construction readiness, to group these critical strategies and critical criteria into underlying constructs and to determine the relationship between strategy constructs and criteria constructs. Design/methodology/approach A systematic literature review and semi-structured interviews were conducted. Then, a survey was developed and distributed to BIM professionals. Data from 118 valid responses were analyzed using the normalized mean analysis, exploratory factor analysis (EFA) and partial least squares-structural equation modeling (PLS-SEM). Findings The analyses identified 23 critical strategies and 20 critical criteria. Three underlying constructs grouped the critical strategies (i.e. model management, coordination and competency) and critical criteria (i.e. model verification, integration and documentation). Moreover, the following relationships are significant: “model management-documentation,” “coordination-model verification,” “coordination-integration,” “coordination-documentation” and “competency-integration.” Originality/value Understanding these interrelationships can help project managers and BIM professionals develop more effective approaches to ensure that BIM-based projects are ready for construction and executed efficiently.

Authors

Institutions

Publication Details

Journal
Open House International
Published
2025-11-20
DOI
https://doi.org/10.1108/ohi-03-2025-0120
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Modeling the strategies and criteria for construction readiness in BIM-based projects

Syahrul Nizam Kamaruzzaman, Afiqah R. Radzi, Nur Farhana Azmi, Reem Abd El Rahman
Open House International
BIM and Construction Integration
article

Modeling the strategies and criteria for construction readiness in BIM-based projects

Syahrul Nizam Kamaruzzaman, Afiqah R. Radzi, Nur Farhana Azmi, Reem Abd El Rahman
article en

Abstract

Purpose Building information modeling (BIM)-based projects that are not ready for construction can lead to project delays and cost overruns. However, projects often start without adequate readiness, despite the negative impacts of starting too early. Developing proper strategies to achieve the criteria for construction readiness in BIM-based projects is essential to ensure successful project execution. Therefore, this study aims to model the relationship between critical strategies and critical criteria for construction readiness in BIM-based projects. To achieve this aim, the study objectives are to identify critical strategies and critical criteria for construction readiness, to group these critical strategies and critical criteria into underlying constructs and to determine the relationship between strategy constructs and criteria constructs. Design/methodology/approach A systematic literature review and semi-structured interviews were conducted. Then, a survey was developed and distributed to BIM professionals. Data from 118 valid responses were analyzed using the normalized mean analysis, exploratory factor analysis (EFA) and partial least squares-structural equation modeling (PLS-SEM). Findings The analyses identified 23 critical strategies and 20 critical criteria. Three underlying constructs grouped the critical strategies (i.e. model management, coordination and competency) and critical criteria (i.e. model verification, integration and documentation). Moreover, the following relationships are significant: “model management-documentation,” “coordination-model verification,” “coordination-integration,” “coordination-documentation” and “competency-integration.” Originality/value Understanding these interrelationships can help project managers and BIM professionals develop more effective approaches to ensure that BIM-based projects are ready for construction and executed efficiently.

Open House International
Universiti Malaysia Pahang Al-Sultan Abdullah (MY), Daffodil International University (BD), State Key Laboratory of Building Safety and Built Environment (CN), Building Research Institute (JP)
Openalex Percentile: Top 62%
BIM and Construction Integration
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.