TBM–rock mass interaction during tunnelling through a fault zone in the Brenner Base Tunnel: Insights from gripper extension measurements

This article presents a case study of double‐shield TBM excavation through a squeezing fault zone, highlighting a major challenge encountered during the construction of the Mules 2–3 section of the Brenner Base Tunnel. The fault, oriented orthogonally to the tunnel alignment, was identified during excavation of the exploratory tunnel and the eastbound main tunnel, where advance was achieved with relatively limited difficulties. In contrast, the westbound main tunnel machine became trapped while crossing the fault, requiring several countermeasures to resume excavation. Monitoring data and geological–geomechanical surveys were subsequently reinterpreted, and a back‐analysis of the rock mass mechanical properties was performed. Particular attention was given to records of gripper extension prior to each advance, which provided a direct estimate of incremental tunnel convergence at the gripper location and allow a reconstruction of the interaction between the rock mass and the shield during the blockage event. The results show that even minor reductions in rock mass quality can significantly deteriorate excavation conditions and lead to TBM blockage. An increased overcut of 50 mm would likely have prevented contact with the front shield.

Authors

Publication Details

Journal
Geomechanics and Tunnelling
Published
2026-11-25
DOI
https://doi.org/10.1002/geot.70168
Primary Topic
Tunneling and Rock Mechanics
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

TBM–rock mass interaction during tunnelling through a fault zone in the Brenner Base Tunnel: Insights from gripper extension measurements

Matteo Lanconelli, Daniela Boldini
1 links
Geomechanics and Tunnelling
Tunneling and Rock Mechanics
article

TBM–rock mass interaction during tunnelling through a fault zone in the Brenner Base Tunnel: Insights from gripper extension measurements

Matteo Lanconelli, Daniela Boldini
article en

Abstract

This article presents a case study of double‐shield TBM excavation through a squeezing fault zone, highlighting a major challenge encountered during the construction of the Mules 2–3 section of the Brenner Base Tunnel. The fault, oriented orthogonally to the tunnel alignment, was identified during excavation of the exploratory tunnel and the eastbound main tunnel, where advance was achieved with relatively limited difficulties. In contrast, the westbound main tunnel machine became trapped while crossing the fault, requiring several countermeasures to resume excavation. Monitoring data and geological–geomechanical surveys were subsequently reinterpreted, and a back‐analysis of the rock mass mechanical properties was performed. Particular attention was given to records of gripper extension prior to each advance, which provided a direct estimate of incremental tunnel convergence at the gripper location and allow a reconstruction of the interaction between the rock mass and the shield during the blockage event. The results show that even minor reductions in rock mass quality can significantly deteriorate excavation conditions and lead to TBM blockage. An increased overcut of 50 mm would likely have prevented contact with the front shield.

Geomechanics and Tunnelling
Tunneling and Rock Mechanics
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon