A Three-Machine Flowshop Scheduling Problem with Linear Fatigue Effect

Highly customized requirements in smart manufacturing result in the unavoidable manual execution of complex operational procedures. Physical and mental fatigue from long work periods for assembly-line operators induces production issues, such as defective work-in-processes or equipment failure. An effective production schedule should account for worker fatigue. This study investigates a three-machine flowshop scheduling problem with the objective of makespan minimization, in which a linear fatigue effect function provides an approximate mathematical representation of fatigue and recovery processes in workers. A mixed integer programming (MIP) model is developed to optimize the integration of automated and human-operated production in manufacturing systems. Given its NP-hardness, an improved tabu search (ITS) algorithm is designed to obtain high-quality solutions, incorporating multiple initial solutions, a well-designed encoding-decoding strategy, and a tabu-based adaptive search mechanism to enhance efficiency. Numerical simulations indicate the veracity of the MIP model and the effectiveness of the ITS algorithm.

Authors

Institutions

Publication Details

Journal
Mathematics
Published
2025-11-16
DOI
https://doi.org/10.3390/math13223670
Primary Topic
Scheduling and Optimization Algorithms
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

A Three-Machine Flowshop Scheduling Problem with Linear Fatigue Effect

Bingfeng Zhao, Jingyi Lu, Han‐yu Zhou, Chin‐Chia Wu et al.
Mathematics
Scheduling and Optimization Algorithms
article

A Three-Machine Flowshop Scheduling Problem with Linear Fatigue Effect

Bingfeng Zhao, Jingyi Lu, Han‐yu Zhou, Chin‐Chia Wu, Xinqi Mao, Shufeng Liu, Xiaoling Wen, Xu Wang, Zehou Sun, Xiaotian Ai
article en

Abstract

Highly customized requirements in smart manufacturing result in the unavoidable manual execution of complex operational procedures. Physical and mental fatigue from long work periods for assembly-line operators induces production issues, such as defective work-in-processes or equipment failure. An effective production schedule should account for worker fatigue. This study investigates a three-machine flowshop scheduling problem with the objective of makespan minimization, in which a linear fatigue effect function provides an approximate mathematical representation of fatigue and recovery processes in workers. A mixed integer programming (MIP) model is developed to optimize the integration of automated and human-operated production in manufacturing systems. Given its NP-hardness, an improved tabu search (ITS) algorithm is designed to obtain high-quality solutions, incorporating multiple initial solutions, a well-designed encoding-decoding strategy, and a tabu-based adaptive search mechanism to enhance efficiency. Numerical simulations indicate the veracity of the MIP model and the effectiveness of the ITS algorithm.

MathematicsVol. 13(22)
Shenyang Aerospace University (CN), Wuhan University of Technology (CN), Feng Chia University (TW), Northeastern University (CN)
Openalex Percentile: Top 52%
Scheduling and Optimization Algorithms
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

A Three-Machine Flowshop Scheduling Problem with Linear Fatigue Effect — Bingfeng Zhao, Jingyi Lu, et al. · Mathematics (2025) | TGRS Research Map | TGRS