Integrated risk management in construction project: utilizing NDSII-BMR and NDSII-BWR for time-cost-safety trade-offs
Purpose This research introduces novel algorithms (NDS-II-BMR and NDS-II-BWR) that combine the simplicity of best-mean-random (BMR) and best-worst-random (BWR) approaches with the opting mechanisms of NDS-II. Design/methodology/approach This study expands on earlier comparison assessments by adding a broader range of algorithms, including MOPSO, NSGAII, PESA2 and WOA, to provide a more comprehensive evaluation approach for the proposed NDSII-BMR and NDSII-BWR algorithms. In addition to typical performance measurements, this study utilizes sophisticated statistical validation through the Wilcoxon signed-rank test to determine the statistical significance of performance differences across this varied range of multi-objective optimization approaches. Findings The results demonstrate the effectiveness of NDSII-BMR and NDSII-BWR in optimizing costs and decreasing safety risks while minimizing time efficiency. These outcomes underscore the applicability of these models for managing complex construction projects in real-world scenarios. Originality/value This study employs multi-objective functions to minimize the total project time and cost while reducing overall safety risks. The proposed model integrates the NDS-II framework with innovative strategies, best-mean-random (BMR) and best-worst-random (BWR).
Authors
- Mehmet Yılmaz (ORCID: https://orcid.org/0000-0001-6164-6233)
- Tayfun Dede (ORCID: https://orcid.org/0000-0001-9672-2232)
- R. Venkata Rao (ORCID: https://orcid.org/0000-0002-9957-1086)
- Hacı Abdullah Uçan (ORCID: https://orcid.org/0000-0001-9049-8858)
- Theint Shwe Sin (ORCID: https://orcid.org/0009-0001-9153-6219)
Institutions
- Ministry of Environment, Forests and Climate Change (IN)
- Karadeniz Technical University (TR)
- Erzincan Binali Yıldırım University (TR)
- Sardar Vallabhbhai National Institute of Technology Surat (IN)
Publication Details
- Journal
- Engineering Computations
- Published
- 2025-11-15
- DOI
- https://doi.org/10.1108/ec-04-2025-0339
- Citations
- 1
- Primary Topic
- Construction Project Management and Performance
- Type
- article
- Field-Weighted Citation Impact
- 2.11