Optimizing construction site layouts with dynamic multi-objective methods and time-based facility placement

Purpose This study addresses the limitations of existing construction site layout planning (CSLP) methods by proposing a dynamic multi-objective optimization model tailored to prefabricated construction projects. Unlike conventional static and phased approaches, the proposed model incorporates time-based facility placement, enabling more realistic and spatially efficient site layouts. It simultaneously optimizes key project objectives, including minimizing hoisting time, reducing hazard risk, and lowering transportation costs. Design/methodology/approach The model captures the temporal overlap of facilities and allows space reuse once a facility is no longer active. It incorporates a comprehensive set of spatial and operational constraints, such as crane working ranges, exclusion zones, overlap avoidance and site boundaries. To solve the model effectively, a hybrid metaheuristic algorithm, oMOAHA, is employed. This algorithm extends the original Multi-objective Artificial Hummingbird Algorithm (MOAHA) by integrating three opposition-based strategies. The model is validated through two real-world case studies: a private hospital and a feed manufacturing complex. Findings The dynamic approach consistently outperforms the static and phased methods by yielding Pareto-optimal solutions with superior quality. The oMOAHA algorithm also outperforms MOAHA and Non-dominated Sorting Genetic Algorithm II (NSGA-II) across multiple metrics, including hypervolume (HV), spacing (SP) and the number of Pareto-optimal solutions (NP). These results confirm the model's robustness for both bi-objective and tri-objective optimization in complex prefabricated environments. Originality/value This study introduces a novel dynamic CSLP model that advances the theoretical and practical understanding of site layout optimization. By combining time-based facility scheduling with a powerful hybrid optimization algorithm, the model fills a critical gap in the literature. Its validation through real-life case studies demonstrates practical applicability and highlights the potential for integration with digital technologies such as building information modeling (BIM) and Digital Twins to enhance adaptability and resilience in dynamic construction contexts.

Authors

Institutions

Publication Details

Journal
Engineering Construction & Architectural Management
Published
2025-11-14
DOI
https://doi.org/10.1108/ecam-01-2025-0131
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Optimizing construction site layouts with dynamic multi-objective methods and time-based facility placement

Vu Hong Son Pham, Thu Anh Nguyen, Duy Hoang Pham
Engineering Construction & Architectural Management
BIM and Construction Integration
article

Optimizing construction site layouts with dynamic multi-objective methods and time-based facility placement

Vu Hong Son Pham, Thu Anh Nguyen, Duy Hoang Pham
article en

Abstract

Purpose This study addresses the limitations of existing construction site layout planning (CSLP) methods by proposing a dynamic multi-objective optimization model tailored to prefabricated construction projects. Unlike conventional static and phased approaches, the proposed model incorporates time-based facility placement, enabling more realistic and spatially efficient site layouts. It simultaneously optimizes key project objectives, including minimizing hoisting time, reducing hazard risk, and lowering transportation costs. Design/methodology/approach The model captures the temporal overlap of facilities and allows space reuse once a facility is no longer active. It incorporates a comprehensive set of spatial and operational constraints, such as crane working ranges, exclusion zones, overlap avoidance and site boundaries. To solve the model effectively, a hybrid metaheuristic algorithm, oMOAHA, is employed. This algorithm extends the original Multi-objective Artificial Hummingbird Algorithm (MOAHA) by integrating three opposition-based strategies. The model is validated through two real-world case studies: a private hospital and a feed manufacturing complex. Findings The dynamic approach consistently outperforms the static and phased methods by yielding Pareto-optimal solutions with superior quality. The oMOAHA algorithm also outperforms MOAHA and Non-dominated Sorting Genetic Algorithm II (NSGA-II) across multiple metrics, including hypervolume (HV), spacing (SP) and the number of Pareto-optimal solutions (NP). These results confirm the model's robustness for both bi-objective and tri-objective optimization in complex prefabricated environments. Originality/value This study introduces a novel dynamic CSLP model that advances the theoretical and practical understanding of site layout optimization. By combining time-based facility scheduling with a powerful hybrid optimization algorithm, the model fills a critical gap in the literature. Its validation through real-life case studies demonstrates practical applicability and highlights the potential for integration with digital technologies such as building information modeling (BIM) and Digital Twins to enhance adaptability and resilience in dynamic construction contexts.

Engineering Construction & Architectural Management
Ho Chi Minh City University of Technology (VN)
Openalex Percentile: Top 63%
BIM and Construction Integration
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.