Thames Tideway Tunnel: TBM performance in the London Clay Formation and overcoming man-made obstructions

An earth pressure balance tunnel boring machine (TBM) was used to construct the 6.5 m internal diameter, 7 km long, section of the Thames Tideway Tunnel project’s main tunnel between Fulham and Acton, in west London. The tunnel was excavated entirely within the London Clay Formation (LCF) containing several divisions (B, A3 and A2). Recognition of these within the ground investigation and later, during shaft construction, provided valuable assistance in the production of an accurate ground model, which further led to the identification of several geological faults. The TBM did not encounter any adverse ground conditions and its performance was seemingly not affected by the different LCF divisions or the faults. However, it was significantly impacted by intersecting two existing boreholes, resulting in the activation of contingency procedures. These included skilfully changing the TBM operating parameters, in addition to increases in the frequency of and additional in-tunnel and surface settlement monitoring to safeguard the integrity of the tunnel structure and surrounding groundmass.

Authors

Institutions

Publication Details

Journal
Proceedings of the Institution of Civil Engineers - Civil Engineering
Published
2025-11-14
DOI
https://doi.org/10.1680/jcien.25.00055
Citations
1
Primary Topic
Tunneling and Rock Mechanics
Type
article
Field-Weighted Citation Impact
0.95
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Thames Tideway Tunnel: TBM performance in the London Clay Formation and overcoming man-made obstructions

Tim Newman, Roser Soler Pujol, Dominic Molyneux
1 citations
Proceedings of the Institution of Civil Engineers - Civil Engineering
Tunneling and Rock Mechanics
0.95
article

Thames Tideway Tunnel: TBM performance in the London Clay Formation and overcoming man-made obstructions

Tim Newman, Roser Soler Pujol, Dominic Molyneux
article en
1 citations

Abstract

An earth pressure balance tunnel boring machine (TBM) was used to construct the 6.5 m internal diameter, 7 km long, section of the Thames Tideway Tunnel project’s main tunnel between Fulham and Acton, in west London. The tunnel was excavated entirely within the London Clay Formation (LCF) containing several divisions (B, A3 and A2). Recognition of these within the ground investigation and later, during shaft construction, provided valuable assistance in the production of an accurate ground model, which further led to the identification of several geological faults. The TBM did not encounter any adverse ground conditions and its performance was seemingly not affected by the different LCF divisions or the faults. However, it was significantly impacted by intersecting two existing boreholes, resulting in the activation of contingency procedures. These included skilfully changing the TBM operating parameters, in addition to increases in the frequency of and additional in-tunnel and surface settlement monitoring to safeguard the integrity of the tunnel structure and surrounding groundmass.

Proceedings of the Institution of Civil Engineers - Civil EngineeringVol. 178(6)
Strabag (Germany) (DE), Jacobs (United Kingdom) (GB), Green Tide Turbines (United Kingdom) (GB)
Openalex Percentile: Top 20%
Tunneling and Rock Mechanics
0.95
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.