Prediction of cost contingency in construction projects by introducing machine learning algorithms

Construction projects are bound by uncertainties and changes by its nature. Thus, cost contingency needs to be allocated to construction project budget to cope with any deviation of actual costs from planned ones. However, existing methods for predicting cost contingencies, as studied and practiced, still present limitations in reliability and accuracy. Machine learning (ML) has gained popularity for enhancing prediction power in various fields. The paper aims to examine various ML algorithms to implement a cost contingency prediction model, employing both continuous and categorical predictor variables. To develop the model, construction transportation project datasets, which were bid between 2013‒2017, were collected from the Florida Department of Transportation (FDOT) website. To address imbalanced regression dataset issues, the synthetic minority over-sampling technique for regression with Gaussian noise (SMOGN) algorithm is introduced. ML random forest (RF) regression associated with random search hyperparameter optimization, achieved remarkably accurate predictions compared to extreme gradient boosting (XGBoost) regression and artificial neural network (ANN) models. The results also demonstrate that four parameters are significant factors in predicting construction cost contingency: project amount, project duration, and latitude and longitude factors. These findings provide new insights for researchers in developing models and for practitioners seeking more advanced method.

Authors

Institutions

Publication Details

Journal
Journal of Civil Engineering and Management
Published
2025-11-13
DOI
https://doi.org/10.3846/jcem.2025.24913
Citations
4
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
8.43

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Prediction of cost contingency in construction projects by introducing machine learning algorithms

Ju-Hyung Kim, Sang-Jun Park, Acinia Nindartin, Kyung‐Tae Lee et al.
4 citations
Journal of Civil Engineering and Management
Construction Project Management and Performance
8.43
article

Prediction of cost contingency in construction projects by introducing machine learning algorithms

Ju-Hyung Kim, Sang-Jun Park, Acinia Nindartin, Kyung‐Tae Lee, Susy Fatena Rostiyanti
article en
4 citations

Abstract

Construction projects are bound by uncertainties and changes by its nature. Thus, cost contingency needs to be allocated to construction project budget to cope with any deviation of actual costs from planned ones. However, existing methods for predicting cost contingencies, as studied and practiced, still present limitations in reliability and accuracy. Machine learning (ML) has gained popularity for enhancing prediction power in various fields. The paper aims to examine various ML algorithms to implement a cost contingency prediction model, employing both continuous and categorical predictor variables. To develop the model, construction transportation project datasets, which were bid between 2013‒2017, were collected from the Florida Department of Transportation (FDOT) website. To address imbalanced regression dataset issues, the synthetic minority over-sampling technique for regression with Gaussian noise (SMOGN) algorithm is introduced. ML random forest (RF) regression associated with random search hyperparameter optimization, achieved remarkably accurate predictions compared to extreme gradient boosting (XGBoost) regression and artificial neural network (ANN) models. The results also demonstrate that four parameters are significant factors in predicting construction cost contingency: project amount, project duration, and latitude and longitude factors. These findings provide new insights for researchers in developing models and for practitioners seeking more advanced method.

Journal of Civil Engineering and ManagementVol. 31(8)
Kangwon National University (KR), Samsung (South Korea) (KR), Institut Teknologi Indonesia (ID), Institut Teknologi PLN, Hanyang University (KR)
National Research Foundation, Hanyang University, National Research Foundation of Korea, Ministry of Science and ICT, South Korea
Openalex Percentile: Top 2%
Construction Project Management and Performance
8.43
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.