Coordinated Multi-Market Regulation Strategy for Hybrid Pumped Storage Power Plants Considering Contracts for Difference

Compared with pure pumped storage, hybrid pumped storage plants (HPSPs) face more complex challenges in electricity markets, such as multi-time-scale decision-making and coupled market mechanisms. Existing mid- to long-term curve decomposition strategies often lead to deviations from actual spot prices and compressed bidding space, limiting profitability and sustainable development. To address this, this study introduces Contracts for Difference (CfDs) to enhance revenue and operational flexibility. A bi-level optimization model is developed for joint participation in spot and frequency regulation markets under CfDs: the upper level maximizes HPSP revenue through capacity allocation and bidding, while the lower level maximizes social welfare via joint energy and ancillary service market clearing. The model is solved using a commercial solver and NSGA-II. Simulations show that CfDs increase spot market revenue by 33.2% and improve bidding alignment with price fluctuations, demonstrating strong market adaptability.

Authors

Institutions

Publication Details

Journal
Processes
Published
2025-11-13
DOI
https://doi.org/10.3390/pr13113670
Primary Topic
Electric Power System Optimization
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Coordinated Multi-Market Regulation Strategy for Hybrid Pumped Storage Power Plants Considering Contracts for Difference

Wenwu Li, Weijun Pan, Zhao Chu
Processes
Electric Power System Optimization
article

Coordinated Multi-Market Regulation Strategy for Hybrid Pumped Storage Power Plants Considering Contracts for Difference

Wenwu Li, Weijun Pan, Zhao Chu
article en

Abstract

Compared with pure pumped storage, hybrid pumped storage plants (HPSPs) face more complex challenges in electricity markets, such as multi-time-scale decision-making and coupled market mechanisms. Existing mid- to long-term curve decomposition strategies often lead to deviations from actual spot prices and compressed bidding space, limiting profitability and sustainable development. To address this, this study introduces Contracts for Difference (CfDs) to enhance revenue and operational flexibility. A bi-level optimization model is developed for joint participation in spot and frequency regulation markets under CfDs: the upper level maximizes HPSP revenue through capacity allocation and bidding, while the lower level maximizes social welfare via joint energy and ancillary service market clearing. The model is solved using a commercial solver and NSGA-II. Simulations show that CfDs increase spot market revenue by 33.2% and improve bidding alignment with price fluctuations, demonstrating strong market adaptability.

ProcessesVol. 13(11)
China Three Gorges University (CN)
Openalex Percentile: Top 66%
Electric Power System Optimization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Coordinated Multi-Market Regulation Strategy for Hybrid Pumped Storage Power Plants Considering Contracts for Difference — Wenwu Li, Weijun Pan, et al. · Processes (2025) | TGRS Research Map | TGRS