“Reference Class Forecasting” – databased risk estimation for complex projects

Abstract This publication presents the data‐based technique of Reference Class Forecasting for risk management in complex major projects. Complex projects consist of plannable and dynamic parts, which lead to changes, surprises and unknown events. Not all opportunities and risks can be estimated correctly. Reference Class Forecasting provides a risk uplift which, due to its statistical nature, also adequately considers feedback loop effects, human expertise and problem‐solving skills as well as the unknown. Reference classes for new projects are formed using a valid project evaluation and statistics on the risk surcharges required for completed projects. Assignment to a class allows a recommendation to the risk uplift.

Authors

Institutions

Publication Details

Journal
Geomechanics and Tunnelling
Published
2025-11-11
DOI
https://doi.org/10.1002/geot.70049
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

“Reference Class Forecasting” – databased risk estimation for complex projects

Frank Lulei, Alexander Bender, Kurt Hechenblaickner
Geomechanics and Tunnelling
Construction Project Management and Performance
article

“Reference Class Forecasting” – databased risk estimation for complex projects

Frank Lulei, Alexander Bender, Kurt Hechenblaickner
article en

Abstract

Abstract This publication presents the data‐based technique of Reference Class Forecasting for risk management in complex major projects. Complex projects consist of plannable and dynamic parts, which lead to changes, surprises and unknown events. Not all opportunities and risks can be estimated correctly. Reference Class Forecasting provides a risk uplift which, due to its statistical nature, also adequately considers feedback loop effects, human expertise and problem‐solving skills as well as the unknown. Reference classes for new projects are formed using a valid project evaluation and statistics on the risk surcharges required for completed projects. Assignment to a class allows a recommendation to the risk uplift.

Geomechanics and TunnellingVol. 18(6)
TU Wien (AT), Universität Innsbruck (AT), Bundesamt für Wasserwirtschaft (AT)
Openalex Percentile: Top 61%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

“Reference Class Forecasting” – databased risk estimation for complex projects — Frank Lulei, Alexander Bender, et al. · Geomechanics and Tunnelling (2025) | TGRS Research Map | TGRS