Planning Preventive Maintenance for Press Machine using Reliability Centered Maintenance (RCM) Method: A Case Study in a Plantation Company

This research focuses on the organized preventive maintenance scheduling of screw press machine for palm oil processing machine in maintaining the company’s productivity and product quality. The minimization of failure risk and productivity enhancement was investigated by means of Reliability Centered Maintenance (RCM) methodology. The preventive maintenance plan was developed based on Failure Modes and Effects Analysis (FMEA) for critical components such as worm screws, bearings, lengthening shafts, and press cages in determining risk and crucial factor which affects productivity. Reliability data from January to December 2023 indicated the initial conditions of these components. Data for this study were collected over a 12-month period, from January to December 2023, to characterize the baseline operational conditions of the system components. Through the application of the proposed reliability-centered maintenance approach, it was determined that achieving a target reliability level of 70% requires a structured maintenance schedule. This includes reconditioning the worm screws every 22 days using SS 304 electrode wire, replacing bearings at 22-day intervals prior to reaching their estimated technical lifespan, inspecting bolts and nuts on the lengthening shaft every 17 days, and inspecting and cleaning the press cage every 18 days. Failure Modes and Effects Analysis (FMEA) confirmed that the implementation of this maintenance strategy significantly reduces the risk of screw press machine failures, mitigates unplanned production downtime, and enhances overall operational efficiency. These improvements contribute to meeting production targets effectively in the context of a competitive global manufacturing environment.

Authors

Institutions

Publication Details

Journal
Journal of Applied Engineering Design and Simulation
Published
2025-09-26
DOI
https://doi.org/10.24191/jaeds.v5i2.116
Primary Topic
Reliability and Maintenance Optimization
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Planning Preventive Maintenance for Press Machine using Reliability Centered Maintenance (RCM) Method: A Case Study in a Plantation Company

Dendi P. Ishak, Keval Priapratama Prajadhiana, Miranda Hotmauli
Journal of Applied Engineering Design and Simulation
Reliability and Maintenance Optimization
article

Planning Preventive Maintenance for Press Machine using Reliability Centered Maintenance (RCM) Method: A Case Study in a Plantation Company

Dendi P. Ishak, Keval Priapratama Prajadhiana, Miranda Hotmauli
article en

Abstract

This research focuses on the organized preventive maintenance scheduling of screw press machine for palm oil processing machine in maintaining the company’s productivity and product quality. The minimization of failure risk and productivity enhancement was investigated by means of Reliability Centered Maintenance (RCM) methodology. The preventive maintenance plan was developed based on Failure Modes and Effects Analysis (FMEA) for critical components such as worm screws, bearings, lengthening shafts, and press cages in determining risk and crucial factor which affects productivity. Reliability data from January to December 2023 indicated the initial conditions of these components. Data for this study were collected over a 12-month period, from January to December 2023, to characterize the baseline operational conditions of the system components. Through the application of the proposed reliability-centered maintenance approach, it was determined that achieving a target reliability level of 70% requires a structured maintenance schedule. This includes reconditioning the worm screws every 22 days using SS 304 electrode wire, replacing bearings at 22-day intervals prior to reaching their estimated technical lifespan, inspecting bolts and nuts on the lengthening shaft every 17 days, and inspecting and cleaning the press cage every 18 days. Failure Modes and Effects Analysis (FMEA) confirmed that the implementation of this maintenance strategy significantly reduces the risk of screw press machine failures, mitigates unplanned production downtime, and enhances overall operational efficiency. These improvements contribute to meeting production targets effectively in the context of a competitive global manufacturing environment.

Journal of Applied Engineering Design and SimulationVol. 5(2)
University of Indonesia (ID), Hochschule Aalen (DE)
Universitas Indonesia, Fakultas Teknik Universitas Indonesia
Openalex Percentile: Top 59%
Reliability and Maintenance Optimization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.