Fusion of numerical simulation and on-site monitoring for full-life-cycle stability regulation and reinforcement optimization of karst region large-span aqueduct slopes: a case study of the Longchang Aqueduct in the Qianzhong Water Hub, China

This study establishes a full-lifecycle stability control framework for ultra-large-span aqueduct slopes in karst terrain, integrating numerical simulation and field monitoring. Using the Longchang Aqueduct slope of Guizhou’s Qianzhong Water Control Project as a representative case, we addressed geological challenges including intense weathering, karst development in limestone/marly limestone, and heterogeneous slope structures. Fast Lagrangian Analysis of Continua in 3 Dimensions (FLAC3D) simulations evaluated slope stability under natural conditions, construction loads (anchor-cable tensioning), and operational impacts (aqueduct seepage and groundwater infiltration). Key innovations include: (1) a karst-adapted modelling protocol that dynamically adjusts rockmass parameters based on RMR classification and real-time monitoring; (2) reinforcement optimisation combining grouting (15 m radius) and 211 prestressed anchors, decreasing maximum foundation displacement from 65.4 mm to 6.4 mm (>90% improvement); and (3) verified operational resilience under seepage, maintaining displacement below 9.1 mm (confirmed via extensometers with ≤1% error). Field monitoring showed stability throughout construction (max. 10.93 mm displacement) and operation, within the ≤12 mm safety threshold. This framework offers a validated methodology for lifecycle stability management of mega-infrastructure in high-risk karst environments.

Authors

Institutions

Publication Details

Journal
All Earth
Published
2025-11-09
DOI
https://doi.org/10.1080/27669645.2025.2586261
Primary Topic
Karst Systems and Hydrogeology
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Fusion of numerical simulation and on-site monitoring for full-life-cycle stability regulation and reinforcement optimization of karst region large-span aqueduct slopes: a case study of the Longchang Aqueduct in the Qianzhong Water Hub, China

Zaixian Xu, Q. Xu, Lu Ke, Longhui Zhao et al.
All Earth
Karst Systems and Hydrogeology
article

Fusion of numerical simulation and on-site monitoring for full-life-cycle stability regulation and reinforcement optimization of karst region large-span aqueduct slopes: a case study of the Longchang Aqueduct in the Qianzhong Water Hub, China

Zaixian Xu, Q. Xu, Lu Ke, Longhui Zhao, Yan-Tao Zheng
article en

Abstract

This study establishes a full-lifecycle stability control framework for ultra-large-span aqueduct slopes in karst terrain, integrating numerical simulation and field monitoring. Using the Longchang Aqueduct slope of Guizhou’s Qianzhong Water Control Project as a representative case, we addressed geological challenges including intense weathering, karst development in limestone/marly limestone, and heterogeneous slope structures. Fast Lagrangian Analysis of Continua in 3 Dimensions (FLAC3D) simulations evaluated slope stability under natural conditions, construction loads (anchor-cable tensioning), and operational impacts (aqueduct seepage and groundwater infiltration). Key innovations include: (1) a karst-adapted modelling protocol that dynamically adjusts rockmass parameters based on RMR classification and real-time monitoring; (2) reinforcement optimisation combining grouting (15 m radius) and 211 prestressed anchors, decreasing maximum foundation displacement from 65.4 mm to 6.4 mm (>90% improvement); and (3) verified operational resilience under seepage, maintaining displacement below 9.1 mm (confirmed via extensometers with ≤1% error). Field monitoring showed stability throughout construction (max. 10.93 mm displacement) and operation, within the ≤12 mm safety threshold. This framework offers a validated methodology for lifecycle stability management of mega-infrastructure in high-risk karst environments.

All EarthVol. 37(1)
Guizhou Normal University (CN), Guizhou University (CN), Sichuan University (CN), Guizhou Water Conservancy and Hydropower Survey and Design Institute (CN), China National Commission for Disaster Reduction (CN), WengFu Group (China) (CN)
Openalex Percentile: Top 64%
Karst Systems and Hydrogeology
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.