Investment Risk Analysis of Municipal Railway Construction Projects Based on Improved SNA Methodology

By analyzing all types of risks in the investment process of a municipal railroad construction project, 16 investment risk factors are extracted, and a network of investment risk factors and a comprehensive impact matrix of the project are constructed by comprehensively applying social network analysis (SNA) and the decision-making test and evaluation laboratory (DEMATEL) method. By analyzing the point centrality, proximity centrality and intermediate centrality of the SNA network, core risk factors such as insufficient operation and management level (degree centrality: 51.111) and cost overruns (in-closeness centrality: 93.75) are identified; through the correlation strength analysis of risk factors via the DEMATEL method, “policy–approval–schedule–cost” is clearly identified. Moreover, through the DEMATEL method, correlation intensity analysis between risk factors was clarified, and six key risk transmission paths were identified, such as “policy–approval–duration–cost”, “market–cost–operation”, etc., among which the cumulative impact coefficient of the “market–cost–operation” path reached 0.664. According to the results of the analysis of core risk factors and key risk transmission paths, targeted investment risk response proposals for municipal railroad construction projects are put forward with regard to four aspects: strengthening the control of core driving factors, curbing the deterioration of key results factors, blocking the risk of intermediate conduction factors, and resisting the impact of marginal risk factors.

Authors

Institutions

Publication Details

Journal
Buildings
Published
2025-11-07
DOI
https://doi.org/10.3390/buildings15224025
Citations
1
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
2.11
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Investment Risk Analysis of Municipal Railway Construction Projects Based on Improved SNA Methodology

Xiaoqing Tong, Gang Hu, Jun Fang, Rupeng Ren et al.
1 citations
Buildings
Construction Project Management and Performance
2.11
article

Investment Risk Analysis of Municipal Railway Construction Projects Based on Improved SNA Methodology

Xiaoqing Tong, Gang Hu, Jun Fang, Rupeng Ren, Chengrui Wang
article en
1 citations

Abstract

By analyzing all types of risks in the investment process of a municipal railroad construction project, 16 investment risk factors are extracted, and a network of investment risk factors and a comprehensive impact matrix of the project are constructed by comprehensively applying social network analysis (SNA) and the decision-making test and evaluation laboratory (DEMATEL) method. By analyzing the point centrality, proximity centrality and intermediate centrality of the SNA network, core risk factors such as insufficient operation and management level (degree centrality: 51.111) and cost overruns (in-closeness centrality: 93.75) are identified; through the correlation strength analysis of risk factors via the DEMATEL method, “policy–approval–schedule–cost” is clearly identified. Moreover, through the DEMATEL method, correlation intensity analysis between risk factors was clarified, and six key risk transmission paths were identified, such as “policy–approval–duration–cost”, “market–cost–operation”, etc., among which the cumulative impact coefficient of the “market–cost–operation” path reached 0.664. According to the results of the analysis of core risk factors and key risk transmission paths, targeted investment risk response proposals for municipal railroad construction projects are put forward with regard to four aspects: strengthening the control of core driving factors, curbing the deterioration of key results factors, blocking the risk of intermediate conduction factors, and resisting the impact of marginal risk factors.

BuildingsVol. 15(22)
Wuhan University of Technology (CN)
Openalex Percentile: Top 9%
Construction Project Management and Performance
2.11
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.