Case Studies on the Distribution System Operation Considering DSO–VPP Coordination and Field Applications of Non-Wires Alternatives (NWAs)

We propose and field-test an ISO–DSO–VPP coordination scheme for distribution-level operation under a Total DSO assumption. The scheme links day-ahead prequalification (1-h resolution, up to three guidance–rebidding iterations) with real-time control (15-min operating interval with 1-min monitoring) so VPP bids and dispatch respect feeder limits (0.95–1.05 p.u., 10 MVA at 22.9 ㎸). We also position ESS-based non-wires alternatives (NWAs) to relieve overloads and defer upgrades while increasing hosting capacity. Field applications in Korea include (i) three feeders in Gwangju–Jeonnam validating constraint clearance via the prequalification–rebidding loop, and (ii) one feeder in Jeju where ESS-based NWAs over ten days achieved 0.2–1.5 ㎿ peak reduction, indicating credible deferral potential. The results clarify the DSO’s operative role and show how LNBA/GNA evaluation can be aligned with market and distribution operations.

Authors

Publication Details

Journal
The Transactions of The Korean Institute of Electrical Engineers
Published
2025-11-11
DOI
https://doi.org/10.5370/kiee.2025.74.11.1868
Primary Topic
Optimal Power Flow Distribution
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Case Studies on the Distribution System Operation Considering DSO–VPP Coordination and Field Applications of Non-Wires Alternatives (NWAs)

Joonseok Oh, Sung-Wook Hwang, Taehwan Kim, Jung-Sung Park et al.
The Transactions of The Korean Institute of Electrical Engineers
Optimal Power Flow Distribution
article

Case Studies on the Distribution System Operation Considering DSO–VPP Coordination and Field Applications of Non-Wires Alternatives (NWAs)

Joonseok Oh, Sung-Wook Hwang, Taehwan Kim, Jung-Sung Park, Suk Woo Nam, Geon-Ho Kim, Jun Kim, Masumoto Ko
article en

Abstract

We propose and field-test an ISO–DSO–VPP coordination scheme for distribution-level operation under a Total DSO assumption. The scheme links day-ahead prequalification (1-h resolution, up to three guidance–rebidding iterations) with real-time control (15-min operating interval with 1-min monitoring) so VPP bids and dispatch respect feeder limits (0.95–1.05 p.u., 10 MVA at 22.9 ㎸). We also position ESS-based non-wires alternatives (NWAs) to relieve overloads and defer upgrades while increasing hosting capacity. Field applications in Korea include (i) three feeders in Gwangju–Jeonnam validating constraint clearance via the prequalification–rebidding loop, and (ii) one feeder in Jeju where ESS-based NWAs over ten days achieved 0.2–1.5 ㎿ peak reduction, indicating credible deferral potential. The results clarify the DSO’s operative role and show how LNBA/GNA evaluation can be aligned with market and distribution operations.

The Transactions of The Korean Institute of Electrical EngineersVol. 74(11)
Openalex Percentile: Top 67%
Optimal Power Flow Distribution
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.