Analysis of the Relationship Between Digital Network Load and Response Time for the Protection System in Industrial Power Stations

This paper analyses the parameterisation of protective relays in industrial power distribution stations, focusing on the quantitative relationship between network load and protection system response time. Laboratory simulations using a dedicated automation cabinet and varying network configurations (six streams at 80 samples/cycle and two to four streams at 256 samples/cycle) revealed a clear correlation: higher network loads lead to longer trip times. Under maximum load (four streams, 256 samples/cycle), response times reached up to 63.75 ms. These delays stemmed from network congestion rather than relay instability. The extended clearing times increased the short-circuit energy (I2t) by approximately 35% on average and over 55% in critical scenarios, requiring upsizing of PVC-insulated conductors from 16 mm2 to 25 mm2 to maintain short-circuit withstand capacity. The findings demonstrate the practical impact of network-induced delays on protection performance, thermal stress, and cable sizing, providing a basis for optimising relay settings and system configuration in modern digital power distribution networks.

Authors

Institutions

Publication Details

Journal
Energies
Published
2025-11-09
DOI
https://doi.org/10.3390/en18225894
Primary Topic
Electrical Fault Detection and Protection
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Analysis of the Relationship Between Digital Network Load and Response Time for the Protection System in Industrial Power Stations

Łukasz Sołtysek, Bartosz Rozegnał, Krzysztof Nowacki, Mateusz Gajos
Energies
Electrical Fault Detection and Protection
article

Analysis of the Relationship Between Digital Network Load and Response Time for the Protection System in Industrial Power Stations

Łukasz Sołtysek, Bartosz Rozegnał, Krzysztof Nowacki, Mateusz Gajos
article en

Abstract

This paper analyses the parameterisation of protective relays in industrial power distribution stations, focusing on the quantitative relationship between network load and protection system response time. Laboratory simulations using a dedicated automation cabinet and varying network configurations (six streams at 80 samples/cycle and two to four streams at 256 samples/cycle) revealed a clear correlation: higher network loads lead to longer trip times. Under maximum load (four streams, 256 samples/cycle), response times reached up to 63.75 ms. These delays stemmed from network congestion rather than relay instability. The extended clearing times increased the short-circuit energy (I2t) by approximately 35% on average and over 55% in critical scenarios, requiring upsizing of PVC-insulated conductors from 16 mm2 to 25 mm2 to maintain short-circuit withstand capacity. The findings demonstrate the practical impact of network-induced delays on protection performance, thermal stress, and cable sizing, providing a basis for optimising relay settings and system configuration in modern digital power distribution networks.

EnergiesVol. 18(22)
University of Life Sciences in Lublin (PL), Cracow University of Technology (PL)
Openalex Percentile: Top 67%
Electrical Fault Detection and Protection
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.