Need for speed most wanted: red tape effect on procurement time

Purpose Often, public procurement is perceived to be too slow. One prominent factor that impedes procurement time is the so-called “red tape” problem. Red tape represents formal or informal constraints to an organisation’s freedom, i.e. rules and regulation but also influence on key stakeholders. These constraints can lead to procedural delay. This study aims to assess the effectiveness of counter-measures to red tape and their effect on public procurement speed and time. Design/methodology/approach This research is imbedded in the case of the German defence industry. Here, several legal and regulatory measures have been taken to reduce procurement time. Using time stamps from the public procurement system of roughly 40,000 procurement procedures in an ex ante /ex post comparison analysis, this study is able to assess different counter-measures and their effectiveness. Findings In this case, the overall duration of public procurement decreased by 36.6% over seven years. Findings show that this reduction in duration is correlated with the reduction of red tape as several measures have been taken to reduce regulatory burden. Furthermore, chi-square testing shows dependency between time and red tape. Social implications While it is not new that superfluous rules and regulations require critical assessment in public procurement, this study is able to demonstrate the effectiveness of top-down laws and directives which aim to reduce procurement durations. Beyond that, the study calls for the introduction of standardised speed metrics to better monitor performance−time relations in public procurement. Originality/value Previous research examined red tape predominantly from a perceptive point of view. In contrast, this study leverages empirical time stamps obtained from an actual procurement system.

Authors

Institutions

Publication Details

Journal
Journal of Public Procurement
Published
2025-11-10
DOI
https://doi.org/10.1108/jopp-04-2025-0039
Citations
1
Primary Topic
Public Procurement and Policy
Type
article
Field-Weighted Citation Impact
2.23
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Need for speed most wanted: red tape effect on procurement time

Markus Holzner, Michael Eßig, Andreas H. Glas, Dominik Oehlschläger
1 citations
Journal of Public Procurement
Public Procurement and Policy
2.23
article

Need for speed most wanted: red tape effect on procurement time

Markus Holzner, Michael Eßig, Andreas H. Glas, Dominik Oehlschläger
article en
1 citations

Abstract

Purpose Often, public procurement is perceived to be too slow. One prominent factor that impedes procurement time is the so-called “red tape” problem. Red tape represents formal or informal constraints to an organisation’s freedom, i.e. rules and regulation but also influence on key stakeholders. These constraints can lead to procedural delay. This study aims to assess the effectiveness of counter-measures to red tape and their effect on public procurement speed and time. Design/methodology/approach This research is imbedded in the case of the German defence industry. Here, several legal and regulatory measures have been taken to reduce procurement time. Using time stamps from the public procurement system of roughly 40,000 procurement procedures in an ex ante /ex post comparison analysis, this study is able to assess different counter-measures and their effectiveness. Findings In this case, the overall duration of public procurement decreased by 36.6% over seven years. Findings show that this reduction in duration is correlated with the reduction of red tape as several measures have been taken to reduce regulatory burden. Furthermore, chi-square testing shows dependency between time and red tape. Social implications While it is not new that superfluous rules and regulations require critical assessment in public procurement, this study is able to demonstrate the effectiveness of top-down laws and directives which aim to reduce procurement durations. Beyond that, the study calls for the introduction of standardised speed metrics to better monitor performance−time relations in public procurement. Originality/value Previous research examined red tape predominantly from a perceptive point of view. In contrast, this study leverages empirical time stamps obtained from an actual procurement system.

Journal of Public Procurement
Universität der Bundeswehr München (DE)
Openalex Percentile: Top 8%
Public Procurement and Policy
2.23
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.