Optimal Deployment of Low-Voltage Instrument Transformers Considering Time-Varying Risk Assessment
To address the “metering blind zone” problem in distribution networks caused by flood disasters, this paper proposes an optimal deployment strategy for low-voltage instrument transformers (LVITs) based on time-varying risk assessment. A comprehensive model quantifying real-time node importance during disaster progression is established, considering cascading faults and dynamic load fluctuations. A multi-objective optimization model minimizes deployment costs while maximizing fault coverage, incorporating dynamic response constraints. A Genetic-Greedy Hybrid Algorithm (GGHA) with intelligent initialization and elite retention mechanisms is proposed to solve the complex spatiotemporal coupling problem. Simulation results demonstrate that GGHA achieves solution quality of 0.847, outperforming PSO, GA, and GD by 7.5%, 11.7%, and 8.7%, respectively, with convergence stability within ±2.5%. The strategy maintains 100% normal coverage and 73.3–95.5% disaster coverage across flood severity levels, exhibiting strong feasibility and generalizability on IEEE 123-node and 33-node test systems.
Authors
- Kangmin Hu (ORCID: https://orcid.org/0000-0003-0520-1963)
- Qiang Yao (ORCID: https://orcid.org/0000-0002-6341-7001)
- Yang Lei (ORCID: https://orcid.org/0000-0003-1277-5607)
- Jiawei Fan
- Yinglong Diao (ORCID: https://orcid.org/0009-0005-8863-7739)
Institutions
- Electric Power Research Institute (US)
- State Grid Corporation of China (China) (CN)
- Shanghai Electric (China) (CN)
Publication Details
- Journal
- Electronics
- Published
- 2025-11-07
- DOI
- https://doi.org/10.3390/electronics14224361
- Primary Topic
- Power Systems Fault Detection
- Type
- article
- Field-Weighted Citation Impact
- 0.00