Identification and evaluation of key stakeholders in mega construction projects: social network analysis and multi-criteria decision-making

Purpose Mega construction projects (MCPs) typically involve numerous stakeholders, necessitating effective management and coordination of these stakeholders. In recent years, the issue of stakeholder management in MCPs has garnered significant attention. However, existing studies often lack an integrated analytical approach that combines both stakeholder identification and evaluation in practical applications. Design/methodology/approach This study proposes an analytical framework that integrates Social Network Analysis (SNA) with Multi-Criteria Decision-Making (MCDM) methods to identify and evaluate key stakeholders in MCPs. First, a stakeholder network model is constructed using SNA, and the structural metrics of each node are calculated. Next, the Entropy Weight Method (EWM) is introduced to determine the objective weights of the indicators, minimizing subjective bias. Finally, the Technique for Order Preference by Similarity to Ideal Solution (TOPSIS) is employed to perform a comprehensive evaluation and ranking of stakeholders. Findings To verify the feasibility and applicability of the proposed approach, a case study of a practical MCP was conducted. The results indicate that the structurally central stakeholders identified through the model closely align with those recognized as influential in project management practice, thereby validating the practical effectiveness of the proposed method. Originality/value This study presents a comprehensive framework for the identification and evaluation of key stakeholders, enhancing transparency and reproducibility by incorporating objective indicator weighting. Furthermore, the proposed framework serves as a practical tool for project managers to analyze and interpret complex stakeholder relationships, thereby facilitating informed decision-making.

Authors

Institutions

Publication Details

Journal
Engineering Construction & Architectural Management
Published
2025-11-05
DOI
https://doi.org/10.1108/ecam-01-2025-0097
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Identification and evaluation of key stakeholders in mega construction projects: social network analysis and multi-criteria decision-making

Shitao Jin, Yuan Deng
Engineering Construction & Architectural Management
Construction Project Management and Performance
article

Identification and evaluation of key stakeholders in mega construction projects: social network analysis and multi-criteria decision-making

Shitao Jin, Yuan Deng
article en

Abstract

Purpose Mega construction projects (MCPs) typically involve numerous stakeholders, necessitating effective management and coordination of these stakeholders. In recent years, the issue of stakeholder management in MCPs has garnered significant attention. However, existing studies often lack an integrated analytical approach that combines both stakeholder identification and evaluation in practical applications. Design/methodology/approach This study proposes an analytical framework that integrates Social Network Analysis (SNA) with Multi-Criteria Decision-Making (MCDM) methods to identify and evaluate key stakeholders in MCPs. First, a stakeholder network model is constructed using SNA, and the structural metrics of each node are calculated. Next, the Entropy Weight Method (EWM) is introduced to determine the objective weights of the indicators, minimizing subjective bias. Finally, the Technique for Order Preference by Similarity to Ideal Solution (TOPSIS) is employed to perform a comprehensive evaluation and ranking of stakeholders. Findings To verify the feasibility and applicability of the proposed approach, a case study of a practical MCP was conducted. The results indicate that the structurally central stakeholders identified through the model closely align with those recognized as influential in project management practice, thereby validating the practical effectiveness of the proposed method. Originality/value This study presents a comprehensive framework for the identification and evaluation of key stakeholders, enhancing transparency and reproducibility by incorporating objective indicator weighting. Furthermore, the proposed framework serves as a practical tool for project managers to analyze and interpret complex stakeholder relationships, thereby facilitating informed decision-making.

Engineering Construction & Architectural Management
The University of Melbourne (AU), Shanghai Tongji Urban Planning and Design Institute (CN)
Openalex Percentile: Top 62%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.