Risk analysis of railway infrastructure projects using the FMEA method

The project consists of a set of interdependent activities, the implementation of which leads to the achievement of a predefined goal. Infrastructure projects on railways are generally of very high value and as such need to be prepared in the best possible way. Projects carry with them certain potential risks, both in the design phase and in the process of their realization. In this paper, risk groups were observed, which each consist of several risk events. They were analysed using the FMEA (Failure Mode and Effects Analysis) method, through the following risk factors: the severity of the event, the probability of the occurrence of the event and the ability to detect the event individually. Also, the impact that risky events have on the project was analysed. The results of the paper show which risky events should be paid special attention during the design process in order to successfully implement the railway infrastructure project.

Authors

Publication Details

Journal
Tehnika
Published
2025-01-01
DOI
https://doi.org/10.5937/tehnika2505537i
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Risk analysis of railway infrastructure projects using the FMEA method

Dragana Macura, Milivoje Ilić
Tehnika
Construction Project Management and Performance
article

Risk analysis of railway infrastructure projects using the FMEA method

Dragana Macura, Milivoje Ilić
article en

Abstract

The project consists of a set of interdependent activities, the implementation of which leads to the achievement of a predefined goal. Infrastructure projects on railways are generally of very high value and as such need to be prepared in the best possible way. Projects carry with them certain potential risks, both in the design phase and in the process of their realization. In this paper, risk groups were observed, which each consist of several risk events. They were analysed using the FMEA (Failure Mode and Effects Analysis) method, through the following risk factors: the severity of the event, the probability of the occurrence of the event and the ability to detect the event individually. Also, the impact that risky events have on the project was analysed. The results of the paper show which risky events should be paid special attention during the design process in order to successfully implement the railway infrastructure project.

TehnikaVol. 80(5)
Openalex Percentile: Top 62%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.