Sustainable Electrical Outfitting in Shipbuilding: A Chemical Tanker Case Study

Electrical outfitting is sometimes overlooked despite its significant impact on build efficiency and vessel performance. It typically occurs towards the end of a ship’s construction. An organized and traceable method for organizing, carrying out, and verifying electrical installation operations is presented in this paper as the Generalized Electrical Outfitting Traceability Management (GEOTM) model. Data on labor utilization, cable routing methods, and cold insulation records were meticulously analyzed when the model was applied to a real-world setting—a 10,000 DWT chemical tanker project. Using organized from-to routing sheets, thoroughly documenting all connections and tests, and integrating electrical components early on during block assembly were all given special attention. This led to a 7.9% reduction in cable waste, less rework, and better timeline compliance, all of which were supported by GEOTM. The early and planned integration of electrical work, which made up a smaller fraction of the total labor, greatly improved build quality and schedule consistency. Beyond the scope of this particular case study, the results indicate that shipyards could benefit from adopting more sustainable, lean, and predictable building techniques by utilizing a digitally backed, traceable model such as GEOTM.

Authors

Institutions

Publication Details

Journal
Sustainability
Published
2025-11-04
DOI
https://doi.org/10.3390/su17219835
Primary Topic
Maritime Transport Emissions and Efficiency
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Sustainable Electrical Outfitting in Shipbuilding: A Chemical Tanker Case Study

Fulya C. Kunter
Sustainability
Maritime Transport Emissions and Efficiency
article

Sustainable Electrical Outfitting in Shipbuilding: A Chemical Tanker Case Study

Fulya C. Kunter
article en

Abstract

Electrical outfitting is sometimes overlooked despite its significant impact on build efficiency and vessel performance. It typically occurs towards the end of a ship’s construction. An organized and traceable method for organizing, carrying out, and verifying electrical installation operations is presented in this paper as the Generalized Electrical Outfitting Traceability Management (GEOTM) model. Data on labor utilization, cable routing methods, and cold insulation records were meticulously analyzed when the model was applied to a real-world setting—a 10,000 DWT chemical tanker project. Using organized from-to routing sheets, thoroughly documenting all connections and tests, and integrating electrical components early on during block assembly were all given special attention. This led to a 7.9% reduction in cable waste, less rework, and better timeline compliance, all of which were supported by GEOTM. The early and planned integration of electrical work, which made up a smaller fraction of the total labor, greatly improved build quality and schedule consistency. Beyond the scope of this particular case study, the results indicate that shipyards could benefit from adopting more sustainable, lean, and predictable building techniques by utilizing a digitally backed, traceable model such as GEOTM.

SustainabilityVol. 17(21)
Marmara University (TR)
Openalex Percentile: Top 70%
Maritime Transport Emissions and Efficiency
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.