Construction and Characteristics of an Engineering Economic Risk Management Platform Based on the BO-GBM Model

Economic risk control is pivotal to the success of engineering projects. Traditional risk assessment methods often fall short in handling the high-dimensional, nonlinear, and strongly correlated risk factors prevalent in modern large-scale projects. To address these limitations, this study constructs an engineering economic risk management platform based on the BO-GBM model, which integrates Bayesian Optimization (BO) with a Gradient Boosting Machine (GBM). The platform employs a systematically constructed four-dimensional feature system encompassing 28 indicators across project ontology, market environment, execution process, and risk association dimensions. A rolling time window strategy is adopted for dynamic model training. Experimental validation on a dataset of 327 projects demonstrates the superior performance of the BO-GBM model: for classification tasks, it achieves an AUC of 0.927 and a recall rate of 91.3%, outperforming the standard GBM by 17.5 percentage points in recall; for regression tasks (cost deviation prediction), it attains an RMSE of 83,200 RMB and reduces the MAPE to 9.7%, surpassing mainstream baseline models. The platform's layered architecture (data, model, service, application layers) enables efficient risk identification and early warning: the time required for risk identification in large projects is drastically reduced from 42.6 hours to 0.52 hours, representing an 81.9-fold efficiency gain; the average single prediction response time is below 127 milliseconds, with a P95 response time of 427 milliseconds under 500 concurrent users; the early warning accuracy reaches 72.5%, with high-risk warnings issued up to 28 days in advance for cost risks and 42 days for schedule risks.

Authors

Institutions

Publication Details

Journal
International Journal of Advanced Computer Science and Applications
Published
2025-01-01
DOI
https://doi.org/10.14569/ijacsa.2025.0161010
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Construction and Characteristics of an Engineering Economic Risk Management Platform Based on the BO-GBM Model

Chaojian Wang, Die Liu
International Journal of Advanced Computer Science and Applications
Construction Project Management and Performance
article

Construction and Characteristics of an Engineering Economic Risk Management Platform Based on the BO-GBM Model

Chaojian Wang, Die Liu
article en

Abstract

Economic risk control is pivotal to the success of engineering projects. Traditional risk assessment methods often fall short in handling the high-dimensional, nonlinear, and strongly correlated risk factors prevalent in modern large-scale projects. To address these limitations, this study constructs an engineering economic risk management platform based on the BO-GBM model, which integrates Bayesian Optimization (BO) with a Gradient Boosting Machine (GBM). The platform employs a systematically constructed four-dimensional feature system encompassing 28 indicators across project ontology, market environment, execution process, and risk association dimensions. A rolling time window strategy is adopted for dynamic model training. Experimental validation on a dataset of 327 projects demonstrates the superior performance of the BO-GBM model: for classification tasks, it achieves an AUC of 0.927 and a recall rate of 91.3%, outperforming the standard GBM by 17.5 percentage points in recall; for regression tasks (cost deviation prediction), it attains an RMSE of 83,200 RMB and reduces the MAPE to 9.7%, surpassing mainstream baseline models. The platform's layered architecture (data, model, service, application layers) enables efficient risk identification and early warning: the time required for risk identification in large projects is drastically reduced from 42.6 hours to 0.52 hours, representing an 81.9-fold efficiency gain; the average single prediction response time is below 127 milliseconds, with a P95 response time of 427 milliseconds under 500 concurrent users; the early warning accuracy reaches 72.5%, with high-risk warnings issued up to 28 days in advance for cost risks and 42 days for schedule risks.

International Journal of Advanced Computer Science and ApplicationsVol. 16(10)
Chongqing University of Science and Technology (CN), Chongqing University of Technology (CN)
Openalex Percentile: Top 62%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Construction and Characteristics of an Engineering Economic Risk Management Platform Based on the BO-GBM Model — Chaojian Wang, Die Liu · International Journal of Advanced Computer Science and Applications (2025) | TGRS Research Map | TGRS