An Empirical Analysis of Construction Material Cost Fluctuations and Their Impact on Project Delivery Timelines in Nigeria

This study investigates the empirical relationship between fluctuations in construction material costs and project delivery timelines in Nigeria. Using quantitative data drawn from construction projects executed between 2010 and 2023, the research assesses how material price volatility affects schedule adherence and project efficiency. The analysis employs correlation and multiple regression techniques to model the relationship between material cost fluctuations, macroeconomic instability, and project time performance. The results reveal a strong positive correlation between material cost variability and project delays, confirming that input price instability significantly prolongs project execution. Inflation and exchange rate volatility amplify these effects, while effective project management practices reduce their magnitude. The findings align with the temporal–economic interaction framework developed by Eke et al. (2016–2023), emphasizing the interdependence of time, cost, and behavioural adaptation in production systems. The study concludes with policy recommendations advocating for local material production, monetary stabilization, and adaptive project management to enhance construction efficiency and sustainability.

Publication Details

Journal
Iconic Research and Engineering Journals
Published
2025-10-17
DOI
https://doi.org/10.64388/irev9i4-1711369-1918
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

An Empirical Analysis of Construction Material Cost Fluctuations and Their Impact on Project Delivery Timelines in Nigeria

Iconic Research and Engineering Journals
Construction Project Management and Performance
article

An Empirical Analysis of Construction Material Cost Fluctuations and Their Impact on Project Delivery Timelines in Nigeria

article en

Abstract

This study investigates the empirical relationship between fluctuations in construction material costs and project delivery timelines in Nigeria. Using quantitative data drawn from construction projects executed between 2010 and 2023, the research assesses how material price volatility affects schedule adherence and project efficiency. The analysis employs correlation and multiple regression techniques to model the relationship between material cost fluctuations, macroeconomic instability, and project time performance. The results reveal a strong positive correlation between material cost variability and project delays, confirming that input price instability significantly prolongs project execution. Inflation and exchange rate volatility amplify these effects, while effective project management practices reduce their magnitude. The findings align with the temporal–economic interaction framework developed by Eke et al. (2016–2023), emphasizing the interdependence of time, cost, and behavioural adaptation in production systems. The study concludes with policy recommendations advocating for local material production, monetary stabilization, and adaptive project management to enhance construction efficiency and sustainability.

Iconic Research and Engineering JournalsVol. 9(4)
Openalex Percentile: Top 63%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

An Empirical Analysis of Construction Material Cost Fluctuations and Their Impact on Project Delivery Timelines in Nigeria · Iconic Research and Engineering Journals (2025) | TGRS Research Map | TGRS