Optimal scheduling of agricultural machines in hilly mountainous areas based on NSGA-Ⅱ-SA hybrid algorithm with applications

Optimizing the scheduling of farm machinery is essential to meet farmers’ requirements, minimize scheduling costs, and save time. This study focuses on scheduling farm machinery in multiple cooperatives across various regions, aiming to minimize scheduling costs and reduce scheduling time. Initially, a multi-constraint hybrid clustering algorithm is employed to assign farmland to each farm machinery cooperative by clustering before scheduling. Subsequently, an enhanced version of the Non-dominated Sorting Genetic Algorithm-Ⅱ (NSGA-Ⅱ) is proposed, integrating a local search strategy based on congestion-based neighborhood search and the Simulated Annealing (SA) algorithm to develop the NSGA-Ⅱ-SA algorithm. This hybrid multi-objective evolutionary algorithm effectively optimizes scheduling costs and time. The model’s validity and the algorithm’s superiority are demonstrated through a Web-based multi-region agricultural machine scheduling system and an example study. Experimental results show that the NSGA-Ⅱ-SA algorithm significantly reduces scheduling costs and time, as well as the number of scheduled farm machines, outperforming other algorithms with reductions of 9.8%, 3.1%, and 8.7% in total scheduling costs, and 12.5%, 13.4%, and 11.6% in total scheduling time. This research establishes a theoretical framework for multi-region agricultural machine scheduling in hilly and mountainous areas, enhancing agricultural production efficiency. Keywords: multi-region agricultural machine scheduling, hilly mountainous area, hybrid optimization algorithm, agricultural machine scheduling system DOI: 10.25165/j.ijabe.20251805.9106 Citation: Liu H Y, Luo J H, Zhang L H, Wang F L, Wang S. Optimal scheduling of agricultural machines in hilly mountainous areas based on NSGA-Ⅱ-SA hybrid algorithm with applications. Int J Agric & Biol Eng, 2025; 18(5): 234–245.

Authors

Institutions

Publication Details

Journal
International journal of agricultural and biological engineering
Published
2025-01-01
DOI
https://doi.org/10.25165/j.ijabe.20251805.9106
Citations
1
Primary Topic
Agricultural Engineering and Mechanization
Type
article
Field-Weighted Citation Impact
0.71
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Optimal scheduling of agricultural machines in hilly mountainous areas based on NSGA-Ⅱ-SA hybrid algorithm with applications

Shuang Wang, Jiahao Luo, Huanyu Liu, Fulin Wang et al.
1 citations
International journal of agricultural and biological engineering
Agricultural Engineering and Mechanization
0.71
article

Optimal scheduling of agricultural machines in hilly mountainous areas based on NSGA-Ⅱ-SA hybrid algorithm with applications

Shuang Wang, Jiahao Luo, Huanyu Liu, Fulin Wang, Li-Han Zhang
article en
1 citations

Abstract

Optimizing the scheduling of farm machinery is essential to meet farmers’ requirements, minimize scheduling costs, and save time. This study focuses on scheduling farm machinery in multiple cooperatives across various regions, aiming to minimize scheduling costs and reduce scheduling time. Initially, a multi-constraint hybrid clustering algorithm is employed to assign farmland to each farm machinery cooperative by clustering before scheduling. Subsequently, an enhanced version of the Non-dominated Sorting Genetic Algorithm-Ⅱ (NSGA-Ⅱ) is proposed, integrating a local search strategy based on congestion-based neighborhood search and the Simulated Annealing (SA) algorithm to develop the NSGA-Ⅱ-SA algorithm. This hybrid multi-objective evolutionary algorithm effectively optimizes scheduling costs and time. The model’s validity and the algorithm’s superiority are demonstrated through a Web-based multi-region agricultural machine scheduling system and an example study. Experimental results show that the NSGA-Ⅱ-SA algorithm significantly reduces scheduling costs and time, as well as the number of scheduled farm machines, outperforming other algorithms with reductions of 9.8%, 3.1%, and 8.7% in total scheduling costs, and 12.5%, 13.4%, and 11.6% in total scheduling time. This research establishes a theoretical framework for multi-region agricultural machine scheduling in hilly and mountainous areas, enhancing agricultural production efficiency. Keywords: multi-region agricultural machine scheduling, hilly mountainous area, hybrid optimization algorithm, agricultural machine scheduling system DOI: 10.25165/j.ijabe.20251805.9106 Citation: Liu H Y, Luo J H, Zhang L H, Wang F L, Wang S. Optimal scheduling of agricultural machines in hilly mountainous areas based on NSGA-Ⅱ-SA hybrid algorithm with applications. Int J Agric & Biol Eng, 2025; 18(5): 234–245.

International journal of agricultural and biological engineeringVol. 18(5)
Xihua University (CN)
Openalex Percentile: Top 26%
Agricultural Engineering and Mechanization
0.71
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.