Progressive Extraction of Railway Tracks via Fused Attention and Residual Mechanisms

To address the challenges associated with the large data volume, extensive distribution, and inherent complexity of railway data, as well as the difficulty in removing objects adjacent to the railway tracks, we propose a progressive railway track extraction method. This method integrates a fused attention mechanism and residual architecture to enhance the accuracy and efficiency of track extraction. Our method is divided into two distinct modules: the ballast bed extraction module and the railway track extraction module. The approach begins with preprocessing the raw point cloud data to facilitate the initial extraction of the ballast bed region. Following this, vegetation points adjacent to the ballast bed are isolated to enhance the accuracy of extraction process. For the railway track extraction, we utilize a sampling and grouping strategy to capture local features from diverse regions using PointNet. The feature learning phase incorporates both residual and attention mechanism to effectively fuse spatial and channel-wise information, thereby enhancing feature representation. Finally, the extracted features are passed through a fully connected layer for the final railway track extraction. Experimental results demonstrate that the proposed method delivers robust performance in accurately extracting railway tracks across various railway environments, showcasing its effectiveness and adaptability in complex scenarios. The proposed method achieves an overall accuracy of 95.84%, with a mean intersection over union of 89.33% for railway track extraction. Additionally, the F1-score for ballast bed extraction exceeds 94%, highlighting the effectiveness and precision of the approach in both track and ballast bed extraction tasks. These results underscore the robustness and reliability of the method in handling complex railway environments.

Authors

Institutions

Publication Details

Journal
Journal of Surveying Engineering
Published
2025-10-29
DOI
https://doi.org/10.1061/jsued2.sueng-1634
Primary Topic
Railway Engineering and Dynamics
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Progressive Extraction of Railway Tracks via Fused Attention and Residual Mechanisms

Zeqian Sun, Zhiyong Lv, Wenming Zhou, Xianghan Duan et al.
Journal of Surveying Engineering
Railway Engineering and Dynamics
article

Progressive Extraction of Railway Tracks via Fused Attention and Residual Mechanisms

Zeqian Sun, Zhiyong Lv, Wenming Zhou, Xianghan Duan, Xiaojuan Ning
article en

Abstract

To address the challenges associated with the large data volume, extensive distribution, and inherent complexity of railway data, as well as the difficulty in removing objects adjacent to the railway tracks, we propose a progressive railway track extraction method. This method integrates a fused attention mechanism and residual architecture to enhance the accuracy and efficiency of track extraction. Our method is divided into two distinct modules: the ballast bed extraction module and the railway track extraction module. The approach begins with preprocessing the raw point cloud data to facilitate the initial extraction of the ballast bed region. Following this, vegetation points adjacent to the ballast bed are isolated to enhance the accuracy of extraction process. For the railway track extraction, we utilize a sampling and grouping strategy to capture local features from diverse regions using PointNet. The feature learning phase incorporates both residual and attention mechanism to effectively fuse spatial and channel-wise information, thereby enhancing feature representation. Finally, the extracted features are passed through a fully connected layer for the final railway track extraction. Experimental results demonstrate that the proposed method delivers robust performance in accurately extracting railway tracks across various railway environments, showcasing its effectiveness and adaptability in complex scenarios. The proposed method achieves an overall accuracy of 95.84%, with a mean intersection over union of 89.33% for railway track extraction. Additionally, the F1-score for ballast bed extraction exceeds 94%, highlighting the effectiveness and precision of the approach in both track and ballast bed extraction tasks. These results underscore the robustness and reliability of the method in handling complex railway environments.

Journal of Surveying EngineeringVol. 152(1)
Xi'an University of Technology (CN), Nanjing Surveying and Mapping Research Institute (China) (CN), National Administration of Surveying, Mapping and Geoinformation of China (CN), GeoInformation (United Kingdom) (GB)
Openalex Percentile: Top 67%
Railway Engineering and Dynamics
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.