Enhanced Short-Term Scheduling of Underground Mining Activities Using Tabu Search: A Comparative Analysis

The planning of preparation and development activities in underground mining is essential to ensure efficiency and operational continuity. However, short-term scheduling of these tasks has received limited attention in literature. This study proposes a Cooperative Multi-start Tabu Search with Path-Relinking (CMTS-PR), which coordinates multiple tabu trajectories and intensifies them through path relinking to optimize the short-term scheduling of multiple underground heading works within a one-shift horizon. The problem is modeled as a flexible job-shop scheduling problem with unrelated parallel equipment and sequence dependent setup times. CMTS-PR is evaluated against a memetic algorithm, a Non-dominated Sorting Genetic Algorithm II, a single-trajectory Tabu Search (TS), a Constraint Programming (CP) model, and manual scheduling by an expert planner, across two panel caving case studies in Chile. The results show that CP yields mathematically optimal solutions but becomes computationally demanding, while manual scheduling ensures feasibility but underutilizes resources. In contrast, CMTS-PR produces operationally viable schedules. In case study 1, CMTS-PR matched CP on equivalent fronts within 60 seconds, even under 10-60 minute transfer time variability. In case study 2, CMTS-PR increased equivalent fronts by 120% compared to manual planning and by 2.94% relative to CP, with lower runtime. Overall, CMTS-PR proves to be effective and computationally efficient, representing one of the first applications of a cooperative TS and path-relinking scheme to underground short-term scheduling, and providing a practical tool for daily mine operations.

Authors

Institutions

Publication Details

Journal
Contemporary Mathematics
Published
2025-10-29
DOI
https://doi.org/10.37256/cm.6620258573
Primary Topic
Mining Techniques and Economics
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Enhanced Short-Term Scheduling of Underground Mining Activities Using Tabu Search: A Comparative Analysis

Heber Hernández, Elisabete Alberdi, Luis Álvarez, Aitor Goti
Contemporary Mathematics
Mining Techniques and Economics
article

Enhanced Short-Term Scheduling of Underground Mining Activities Using Tabu Search: A Comparative Analysis

Heber Hernández, Elisabete Alberdi, Luis Álvarez, Aitor Goti
article en

Abstract

The planning of preparation and development activities in underground mining is essential to ensure efficiency and operational continuity. However, short-term scheduling of these tasks has received limited attention in literature. This study proposes a Cooperative Multi-start Tabu Search with Path-Relinking (CMTS-PR), which coordinates multiple tabu trajectories and intensifies them through path relinking to optimize the short-term scheduling of multiple underground heading works within a one-shift horizon. The problem is modeled as a flexible job-shop scheduling problem with unrelated parallel equipment and sequence dependent setup times. CMTS-PR is evaluated against a memetic algorithm, a Non-dominated Sorting Genetic Algorithm II, a single-trajectory Tabu Search (TS), a Constraint Programming (CP) model, and manual scheduling by an expert planner, across two panel caving case studies in Chile. The results show that CP yields mathematically optimal solutions but becomes computationally demanding, while manual scheduling ensures feasibility but underutilizes resources. In contrast, CMTS-PR produces operationally viable schedules. In case study 1, CMTS-PR matched CP on equivalent fronts within 60 seconds, even under 10-60 minute transfer time variability. In case study 2, CMTS-PR increased equivalent fronts by 120% compared to manual planning and by 2.94% relative to CP, with lower runtime. Overall, CMTS-PR proves to be effective and computationally efficient, representing one of the first applications of a cooperative TS and path-relinking scheme to underground short-term scheduling, and providing a practical tool for daily mine operations.

Contemporary Mathematics
Universidad de Deusto (ES), University of the Basque Country (ES), Universidad Santo Tomás (CL)
European Commission
Openalex Percentile: Top 60%
Mining Techniques and Economics
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.